My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-11-1995 Council Packet
Orono
>
City Council
>
1995
>
09-11-1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2023 12:48:21 PM
Creation date
10/6/2023 12:43:13 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BONirrES OF THE REGULAR ORONO CITY COUNCIL <br />MEETING HELD ON AUGUST 2S, 1^ <br />(#13 - CtHinty Road 15 at Bracketts Point Curve - Continued) <br />Hie width of the road will involve an 8* shoulder and one 12'lane in each direction as <br />wefl as the introduction of the left turn lane. The curve speed would be 25 mph and <br />would provide a better sight distance than currently seen There would also be room for <br />a disabled vehicle. Better safety would be provided for anyone walking or biking the <br />road. Several Council Members voiced their concern with anyone biking or walking on <br />the road. The County has spoken with several neighbon on the project, which was <br />staked in April of 1995. <br />Kelley, Jabbour, and Goetten were all of the opinion that the road project should be <br />discussed with the neigU>ors. <br />Kelley asked what would happen if sewer were to come to the area. Gerhardson said the <br />connection could be made to City lines and a lift station built. <br />Callahan remarked that the neighbors voiced their concern with the project a year ago. <br />Hurr opinions might be different with the project totally within the right-ot-w^y. <br />Callahan asked that a vote be taken on the project soon It was decided that the <br />neighborhood would be presemed with the project first and then a vote taken. <br />Council directed to proceed with the project and set up the neighborhood meeting <br />(#14) COUNTY ROAD 15 MAJOR MAINTENANCE PROJECT: ORONO <br />ORCHARD INTERSECTION ,\ND EAST <br />Polyczyk from Hennepin County noted that at the May 22 meeting of the Council, the <br />Council approved a preliminary layout which would eliminate the right turn, and move <br />the intersection to the east Concern was expressed over the right-of-way costs. Based <br />on the approval given on the layout, the cost was projected at $265,000 to be shared <br />equally between the City and County This was presented to the City and found to be too <br />high in cost In responding to what could be done, the County met with Mn/DOT and <br />determined that the recovery area could be downscaled Because the area was platted, <br />the County was able to change from a rural recovery requiring 30' to a suburban <br />recovery, requiring 20' Polyczyk said the real estate people evaluated the new right-of- <br />way, and a projected cost was found to be $200,000, which would be shared equally <br />between the City and County. <br />Goetten asked if the cost would be less if the work was done on the south side. Moorse <br />and Jabbour said it would probably cost more in that area. <br />The mitigation for the wetlands is unknown as this time <br />The approval for the improvement has already been granted. At this time, the Council <br />needs to approve the cost orrly.
The URL can be used to link to this page
Your browser does not support the video tag.