My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-28-1995 Council Packet
Orono
>
City Council
>
1995
>
08-28-1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2023 12:17:43 PM
Creation date
10/6/2023 12:14:53 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f. <br />g- <br />h. <br />I. <br />J <br />The &pplic(int will be required lo execute the standard Oversize Accessors’ <br />Structure Covenant, which places limitations on the tuture subdivision of <br />the property in order to ensure that the oversized accessory structure will <br />not become non-conforming due to a future subdivision. <br />The building is proposed to be located 470 from the westerly lot line, <br />640 ’ from the northerly lot line. 800 ’ from the southerly lot line, and <br />1200 ’ from the easterly lot line. Section 10.20, Subdivision 3 (C) <br />requires a mimmum 50 ’ setback from any property’ lines tor such a <br />struemre. The proposed building is sufficiently distant from neighboring <br />properties to have no signi ‘“icant impact on those properties. <br />Because the portion of property between the proposed building kx;ation <br />and the surrounding roads to the west and mirth is relatively open, it <br />would be appropriate to require a vegetative screening plan be developed <br />to minimize the visual impact of the building as viewed trom those roads. <br />The proposed land alteration to relocate fairways #15 and #16 involves the <br />movement of approximately 1800 cubic yards ot till on the site, with no <br />import or export of fill proposed. <br />No wetlands are involved in the project. However, there is the potential <br />of creating a 3000-5000 s.f. pond on the upland as part of the fill <br />balancing. Such pond will become an integral feature of the golf course. <br />No changes are proposed to tees or greens at this time. The proposed <br />work will be done in the Fall of 1995, and applicant has stated his intent <br />to commence revegetation immediately so that the course is in condition <br />to be playable in 1996. <br />This proposal is part of a long-term master plan for improvements of the <br />course. However, this review only involves reconstruction of fairways <br />#15 and #16 and the construction of the proposed storage building. <br />Pace 3 of 6
The URL can be used to link to this page
Your browser does not support the video tag.