Laserfiche WebLink
f ■.UTS ISSUED/FEES COLIECTED •>*YEAR-TO-DATEEPORT NBR. BPRMTISS*! ATE OP RUN 08/01/9S PERMIT ISSUED REPORT CITY OF ORONO i « * f •PAGEi 1 REQUESTER: CAROLEBRMIT TYPE <br />uilding <br />GL PAMILY-NEN <br />UPLBX-NEIf <br />P-ADD/RBMODEL <br />F-ACC STRUCTURE <br />rCMO/PRINCIPAL <br />UM-ADD/REMODBL <br />•EHO <br />NST-ADD/RBHODiftL <br />;P*LAND ALT <br />QTY <br />20 <br />0 <br />132 <br />19 <br />9 <br />7 <br />1 <br />-- CURRENT RANGB - 01/01/9S - 07/31/95 •- PREVIOUS RAJJGB - 01/01/94 - 07/31/94BASE FEB <br />34.136.35 <br />0.00 <br />31.908.50 <br />3.369.00 <br />570.00 <br />2,420.50 <br />30.00 <br />56.75 <br />72.00 <br />VALUATION <br />6.461.278.00 <br />0.00 <br />3.664.176.00 <br />379.400.00 <br />0.00 <br />302.542.00 <br />0.00 <br />1,800.00 <br />5.000.00 <br />PLAN REVIEW <br />22.187 <br />0 <br />17.213 <br />2.135 <br />0 <br />.28 <br />.00 <br />.35 <br />.25 <br />.00 <br />111.15 <br />0 <br />36 <br />46 <br />.00 <br />.89 <br />.80 <br />QTY <br />19 <br />1 <br />115 <br />12 <br />7 <br />5 <br />0 <br />2 <br />0 <br />BASE FEB <br />25.380.00 <br />15.00 <br />16.167.50 <br />1.223.50 <br />410.00 <br />477.00 <br />0.00 <br />762.50 <br />0.00 <br />VALUATION <br />5.689.720.00 <br />500.00 <br />1.756.690.80 <br />106.300.00 <br />0.00 <br />37.300.00 <br />0.00 <br />90.340.00 <br />0.00 <br />PLAN REVIEW <br />16.497.06 <br />0.00 <br />8.175.43 <br />738.73 <br />0.00 <br />81.90 <br />0.00 <br />281.13 <br />0,00 <br />»LAN REVIEW ONLY 1 0.00 550,000.00 1,423.18 0 0.00 0.00 0.00 <br />)BMO-ACCESSORY 5 170.00 0.00 0.00 1 30.00 0.00 0.00 <br />VCC/GARAGES <br />*ub-total <br />7 1.194.50 75,225.00 762.70 13 1,607.00 175,620.00 1,184.95 <br />203*73.927.60*11.519.421.00*43.916.60*175*46,072.50*7,856.470.80*26,959.20* <br />techanlcal <br />{BATING SYSTEMS 38 3.111.08 235,941.00 0.00 47 4,336.11 329,167.04 0.00 <br />MR CONDITIONING 9 525.00 34,050.00 0.00 6 230.00 13,061.00 0.00 <br />iOOD STOVE/FLUE 0 0.00 0.00 0.00 3 151.25 10,200.00 0.00 <br />TREPLACE 31 1.403.75 76.924.00 0.00 20 1,210.00 00,009.16 0.00 <br />VENTILATION 1 35.00 1,200.00 0.00 1 35.00 1,150.00 0.00 <br />•'UEL STORAGE 0 0.00 0.00 0.00 1 35.00 2,000.00 0.00 <br />;AS line INSPECT 3 105.00 1,100.00 0.00 6 210.00 5,400.00 0.00 <br />f)UCT WORK ONLY 8 280.00 7,065.00 0.00 3 132.50 7,000.00 0.00 <br />REMOVE OIL TANK 5 175.00 5,450.00 0.00 7 245.00 5,400.00 0.00 <br />UNDEFINED 1 247.50 19,000.00 0.00 0 0.00 0.00 0.00 <br />.Sub-total 96*5,082.33*382,330.00*0.00*94*6,584.94*454,268.00*0.00* <br />Plumbing <br />FIXTURES 70 5.402.70 371,051.95 0.00 74 5.300.42 367,703.06 0.00 <br />WATER METER 3 349.00 1.200.00 0.00 8 1,520.00 0.00 0.00 <br />UNDEFINED 2 70.00 700.00 0.00 0 0.00 0.00 0.00 <br />.Sub-total 75»5.821.70* 373.751.95*0.00*02*6,900.42*367,703.06*0.00* <br />Sewer k Water <br />.SEWER CONNECTION 2 70.00 0.00 0.00 16 560.00 0.00 0.00 <br />WATER CONNECTION 0 0.00 0.00 0.00 6 210.00 0.00 0.00 <br />NEW SEPTIC SYSTE 23 2.300.00 0.00 0.00 10 1,000.00 0.00 0.00 <br />URNFLD «i/OR TANK 2 100.00 0.00 0.00 2 150.00 0.00 0.00 <br />SAC ONLY 1 050.00 0.00 0.00 14 9,600.00 0.00 0.00 <br />SEWER k WATER 1 70.00 0.00 0.00 3 210.00 0.00 0.00 <br />Sub-total 29*3,390.00*0.00*0.00*51*11,730.00*0.00*0.00* <br />Sign <br />PERMANENT/POSTED 2 70.00 1,500.00 0.00 2 70.00 0.00 0.00 <br />PER./FREE STANDG 1 35.00 400.00 0.00 1 39.00 1,200.00 0.00 <br />TEMPORARY 2 60.00 0.00 0.00 2 6 0.00 0.00 0.00 <br />.Sub-total 5*165.00*1,900.00*0.00*5*169.00*1,200.00*0.00* <br />Fire <br />FIREWORKS 3 150.00 0.00 0.00 0 0.00 0.00 oo•o