My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-14-1995 Council Packet
Orono
>
City Council
>
1995
>
08-14-1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2023 12:01:09 PM
Creation date
10/6/2023 11:57:49 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE ORONO PLANNING COMMISSION MEETING HELD ON JULY 17. 1995 <br />(#10 - #2041 PhU & Darcy Otto - Continued) <br />Mabusth said additional fill firom the excavation was placed in the rear yard. The Otto's <br />are »tt<»mpring to provided a gentler slope to the rear yard. The problem at the east side <br />h— been intoisified. The problem now is how to deal with the finished elevations at the <br />east jwd at 15' width and maintain 2:1 slope, and also allow walking access to rear yard. <br />Mabusth said it would be necessary to contact the property owner to the east to gain <br />approval of any encroachment The property is possibly in the in the process of going tax <br />foifdt. <br />Mabusth said detail on elevations, catch basins, and final grades arc needed Planning <br />Commission is unable to make any fimher recommendations until the criteria established <br />engineer is addressed. Mabusth asked the Commission if they prefer to revisit the <br />application prior to going to the Council. The landscaping plan would be done at that <br />point. The Commission had no problem with the application going forward if it met the <br />criteria of the Engineer. It was recommended that the landscape architect work with the <br />City Engineer. <br />Glen Sauer of 4104 Highwood reported his concern with drainage fi-om this lot exceeding <br />the capacity of the ditch and retaining pond on his property Sauer does not want this <br />property to further impact his yard Pictures trem heavy rains in 1978 and 1987 were <br />shown to eiTiphasize the problems <br />Sauer said he was concerned with the filling in the Otto s back yard and the change in the <br />slope in that area. It is Sauer's opinion that how fast the drainage flows does not matter. <br />Sauer says it all wall eventually go through the 20' culvert with 8" tiles. He does not want <br />any fill to hamper any of the retention areas It was noted that the gentler slope may aid in <br />water seeping down into the ground of the Otto property Mabusth said the fill and sod <br />should decrease the velocity of the flow Sauer said there is no more storage capacity <br />available. <br />Mabusth said she would have Glerm Cook review the drainage issue with Shawn <br />Gustafson. Cook is familiar with the drainage history of the area. The Planning <br />Commissioners said this fimher information will need to be studied. <br />Lindquist moved, Berg seconded, to table Application #2041 for fimher engineering <br />review by City Engineer Cook. Planning Commission would like to receive confirmation <br />on what will occur to the retention areas further downstream Ayes 4, Nays 0.
The URL can be used to link to this page
Your browser does not support the video tag.