My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-14-1995 Council Packet
Orono
>
City Council
>
1995
>
08-14-1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2023 12:01:09 PM
Creation date
10/6/2023 11:57:49 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
fct <br />MINUTES OF THE REGULAR ORONO PARK COMMISSION <br />NffiETING HELD ON JULY 13, 1995 draft <br />(#5) UPDATE ON CRYSTAL BAY PLAYGROUND (MCMILLAN) <br />MrVfiTlan reported that tho fencing, plantings, and seeding has been done. The parking lot <br />has been stancd. The ADA consultant has recommended that the playground equipment <br />baiefitting handicapped children be installed at this time along with the other playground <br />equipment. Earl Anderson Co. wiU be instaUing the regular playground equipment. The <br />Council has been informed of the high bid received of S3,500 for the ADA play^ound <br />equipment. Gerhardson is awaiting receipt of the other bid and will present to Council for <br />approval. Since the Park Commission is aware of the high bid. there will be no need to <br />present to the commission any other bid before going to Council. <br />The ADA equipment consists of three pieces. The playground equipment has been <br />ordered and is expected in 6-S weeks according to Gerhardson The timbers will be <br />completed at that time also It was noted that the grading and pea rock installation will be <br />done by City employees <br />Howells asked if the ADA upgrade would be required at all parks. Gerhardson said this <br />could be done as parks are upgraded. <br />$14,227 has been approved to date by tl e Council. Total costs are $I8,9«-, which <br />includes $2125 for the burying of the underground wires, and $2500 lor the pea rock <br />The walkway, whose fuiiding has been approved, will be completed in conjunction with <br />the parking lot. This, aloi g witn C remainder of the plantings, should be completed by <br />fall. As mentioned above. The .\DA playground equipment is out for airther bid and has <br />not been approved <br />McMillan noted that neighbors have asked about fencing around the parking lot area to <br />increase the level of safety. Gerhardson said this would intertere with the snow plowing. <br />This area will have plantings instead <br />(H6) UPDATE ON OPEN SPACE PLANNLNG PROCESS (GERHARDSON) <br />The first phase questionnaire of the open space planning process is being reviewed. <br />Gerhardson passed out the phase 2 questionnaire to the Park Commission members for <br />their completion. <br />(#7) REVIEW AND EVALUATION OF PROGRESS ON 1995 PARK <br />COMMISSION ACTION PLAN <br />Howells asked Gerhardson about the work awaiting Highvvood Nature Trail, item tf3 on <br />the action plan. Howells said this was to nave been completed atier the load limits were <br />lifted from the roadway s Gerhardson said he would put it on his schedule as soon as <br />possible. Wilson will continue working with Gerhardson towards completion of the trail <br />this fall. Howells will contact boy scout troop liaison for troop involvement at Highwood.
The URL can be used to link to this page
Your browser does not support the video tag.