My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-14-1995 Council Packet
Orono
>
City Council
>
1995
>
08-14-1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2023 12:01:09 PM
Creation date
10/6/2023 11:57:49 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE REGULAR ORONO PARK COMMISSION <br />MEETING HELD ON JLXY 13, 1 995 AFT <br />Gerhardson informed the Commission of the pending sale of the land along Old Crv’stal <br />Bay Road north of Watertown Road, w hich is part of the tnul system, The property' will <br />change ownership in August. The new owner is willing to gram the an easement to <br />build the trail on the property in remm for a credit against future Park Dedication tees. <br />The current owner had not wanted the trail to be a stumbling block ter any forthcori^g <br />sale of the property. Gerhardson reported that because of the pending s^e, the DNH has <br />granted a 30-day extension from the onmnal deadUne of August 30 tor the trail to be built. <br />The grant from the DNR has been appro\-ed and will result in matching t^ds up to a <br />certain dollar amount The other 501 o of the funds will come from Park Dedicatum <br />money. The gram tlinding covers the portion of the trail w hich is contiguous This wi <br />include for 1995 the completion of the trail from the Dickey pioperty south to Luce <br />Line and north from the Dickey property across Watertown Road to the top ot the hill <br />Curb and laitter will be installed south of the Dickey property to the Luce Line becauM <br />the property owners there were not willing to grant an easement The DNR grant will not <br />cover the cost of curb and gutter but will cover 50® i of the trail cost in this area There <br />will be a 4’ grass area provided between the trail and the curb Gerhardson will present <br />the Commission with exact dollar costs of the trail segments at the ne.xt meeting including <br />the portion to be paid by the D.NR gram. DNR gram for this year is about $29,000 ^^nth a <br />possible $50,000 grant money available in 1996 The DNR matching fund gram money is <br />geared towards projeas exactly like this one for transit/trails only. <br />McMillan asked if Hennepin County is participating in the trail Due to time constraints in <br />updating the contract with the City, and a concern over the Hwy 12 cloverleat design near <br />Baker Park, Hennepin County has withheld their participation at this time White said the <br />County does have the funds set aside and -.vlh v-ive this money for the trail segment to <br />Baker Park Flint commented that this has been very frustrating; WTien the City is ready, <br />Hennepin Parks is not; a year ago when Heimepin Park was ready, the City was not. We <br />are fortunate that the delay has not raised the cost ot the trail. Gerhardson said that the <br />1995 work will be completed by September of this year Flint reported that Gerhardson <br />was able to negotiate costs with the contractor obtaining the same cost per yard for the <br />shorter trail seamem as it would have cost for the longer segment Normally a shorter <br />lament is more costly, but not this time because the contractor was already in the area <br />doing the Hwy 12 improvement project <br />Wilson asked whether the Park Commission had formally approved the binding from the <br />Park Dedication money The approval was noted in the .April meeting minutes, page 12. <br />last paragraph ot the Old Crystal Bay Road Trail item.
The URL can be used to link to this page
Your browser does not support the video tag.