Laserfiche WebLink
3.2.3. Toe Gty agrees to contribute to a maintenance fund to cover the sediment <br />removal costs of die wet detention ponds/wetlands, as defined in the Maintenance Plan <br />described in paragraph 3.1.7 of iHs Agreement, in an amount not to exceed S7.000 per year <br />during the term of this Agreement. The City’s contribution for this purpose may be made <br />either through a direct financial contiihudon to the MCWD’s maintenance fund established <br />for this project, or through in-kind services provided by the Qty for sediment removal or fish <br />barrier maintenance described in paragraph 3.2.4. In the event that the Gty contributes more <br />than S7.000 in in-kind services in a given year. MCWD agrees to reimburse the City for the <br />amount which c.icccd.s 57,000. <br />3.2.4. The City of Orono agrees to be responsible for any necessary cleaning <br />associated with rhe structural fish bardtr to be installed at the County Road 6 wet detention <br />pontl/wetJand. <br />4. Monito r nn Plan <br />MCWD agrees to ds''clop and implement a water quality monitoring plan <br />("Monitoring Plan”) which wUl identifj' the specific sampling procedures, analytic methods, <br />detection limits, quahty assurance and quality control procedures m order to facilitate the <br />accurate measurement of baseUne data and any changes in water quality throughout the Long <br />Lake subwaicrsted for the duration of this project. The Monitoring Plan shall be submitted <br />to the City for review and comment before any actions implementing the Monitonng Plan are <br />commenced. The MCWD shall be responsible for the selection of a qualified laboratory to <br />perform the data analysis required by the Monitoring Plan and shaU be responsible for the <br />costs of the laboratory sample analysis. The MCWT) agrees to provide the data anlysis <br />537,':20S589t 8/4/95