My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-10-1995 Council Packet
Orono
>
City Council
>
1995
>
07-10-1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2023 11:18:52 AM
Creation date
10/6/2023 11:11:12 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br />m Zoning File #2020 <br />May 3, 1995 <br />Page 2 <br />B.PRELIMEVARY SUBDIVISION OF THREE LOTS, CLASS III <br />Pertinent Ordinances <br />1.Section 10.23, Subdivision 6 (B) - Lot standards for LR-IA zoning district. <br />Lot width variance - Lot 3 ,, •., <br />Required = 200 ’ (Refer to Section 10.02, Definition 43 (A) - Required lot width <br />for non-lakeshore lots. Width is measured to the rear of the 50’ street <br />yard setback.) <br />Existing = 199.98’ <br />Variance = .02 ’ or .25" T* <br />2.Section 11.10, Subdivision 10 (C) - Class III Subdivision - Preliminary. <br />3.Section 11.10, Subdivision 21 (C). <br />4.Section 11.33, Subdivision 4 - Typical section for a three lot plat. <br />Review of Preliminary Subdivision <br />All three lots meet the required lot area. Lot 1 can credit area of 20 wide drainage <br />easement as property is served with sewer. Lot 3 does not meet the required lot width shown <br />at 199 98’. It lacks a quarter of an inch of lot width to the rear of the 50 street yard setbac . <br />The applicant has been unable to acquire additional area from either the north or south of the <br />property. The additional area has been acquired from the property to the immediate west of <br />proposed Lot 2 and will be included as part of the area of Lot 2. The Purchase Agreenient tor <br />the 0.10 acre has been included in your packets for the lot line rearrangement (Application <br />#2021). <br />All lots shall be served by sewer from O.xford Road. As already noted in the earlier <br />sketch plan review, the lot has been assessed for one sewer unit. Two additional sewer unUs <br />at a cost of $24 225 each must be paid prior to final plat approval. There is adequate capacity <br />in the sewer lines in Oxford Road to allow hook-ups for two additional units. Note on your <br />preliminarv plan. Exhibit J, the future sewer line will be located within an easement area along <br />the shared'lot lines of Lots 1 and 2. Easements along this interior shared lot line should be <br />shown at 10' from the center line rather than the normal 5’ on either side of the shared lot me. <br />Upon application for a building permit for the development of Lot 3, the owner/budder will be <br />responsible for providing a detailed plan of the connection and service extension. The plans to <br />be in accordance with attached plates submitted by Gustaf.son with cleanouts spaced at a <br />minimum of 100’ apart.
The URL can be used to link to this page
Your browser does not support the video tag.