Laserfiche WebLink
I Exhibit E-1 <br />I <br />1991 <br />Pirf)lic <br />1992 <br />Stubbs Bay <br />Facilities Sewer Totals <br />Ccmstructian Construction 1994 1993 <br />$$182.783 $939.791 $771.397 <br />7,157 43.449 31.(KK) <br />—1.399 2.970 <br />——48.572 62.612 <br />———1.496 <br />331 <br />$$189.940 $ 1,033.21 L $869.806 <br />$$7.857 $240.489 S 65.358 <br />—10.043 22,981 <br />__49.953 64.628 <br />———1.495 <br />7.857 3(K).485 1.54.462 <br />178,718 <br />—320.969 46.5.311 <br />——187.837 230.608 <br />—182.083 223.920 (1.59,293) <br />—182.083 732.726 715.344 <br />$$189.940 S 1.033.211 $869.81)6 <br />-76 <br />iisS