Laserfiche WebLink
request for council action <br />DATE: June 30, 1995 <br />ITEM NO.:r <br />Department Approval: <br />Nane Jeanne A. Mabusth <br />Title Building & Zoning Administrator <br />Administrator Reviewed:Agenda Section <br />Zoninii <br />Item Description: #2025 Michael Plank, di 15/4147 Watenown Road - Preliminar>' <br />Subdivision of Replat of Lots 2 and 3 of Maple Place Plat - Resolution <br />Brief Review of Application <br />Review Exhibits D-1 and 2, the original plat of Maple Place was approved in 1983 and <br />involved the plat of three lots. The current division involves Lots 2 and 3 ot that plat. In 1993, <br />applicant proposed a lot line rearrangement of Lots 2 and 3, review Exhibit D-2, and received <br />an approval recommendation from the Planning Commission but w?s never completed. Since <br />the Planning Commission ’s 1993 approval, the back lot/front lot ordinance was passed and now <br />proposed Lot 2 would have to be increased to 7.5 acres. The back lot ordinance requires 150% <br />of the area for the RR-IA zoning district (5 acre minimum). <br />During a lengthy sketch plan review with the Planning Commission at their May meeting, <br />the Planning Commission recommended that applicant replat Lots 2 and 3 and now designate a <br />private road outlet. Lot 2 would no longer be considered a back lot as it would be served by <br />a private road. Platting the roau outlot w ith the current lot line rearrangement ensures applicant <br />of three residential units with 19+ acres (3.61 acres wet). Refer to Exhibit G. Proposed Lot <br />2 meets the 5 acres of dry land. Lot 1 at 10.3 acres would have adequate dry buildable land for <br />a future division. Applicant was further advised at the sketch plan review that the northern lot <br />of that future division would have to be served by the road outlot to the east and that developer <br />would also be responsible for installing -» private road. <br />At the public hearing for the preliminary subdivision application, applicant asked that <br />Planning Commission amend their original directive and asked that the condition ot approval <br />only asic that access to the properties and required upgrade of road be subject to current City <br />standards at the time of the future subdivision. Planning Commission had no problem with <br />amending their original directive. <br />Applicant will proceed with the vacation of the drainage and utilities that intersect <br />proposed Lot 1, refer to Exhibit D-1. A public hearing has been scheduled for the Planning <br />Commission meeting in July. <br />The application also involves the granting of a width variance to proposed Lot 2 as lot <br />only measures 200’ at the 100’ setback. Planning Commission members felt that this type of <br />width variance was consistent when lots abut a cul-de-sac.