Laserfiche WebLink
M!n.eh.ha w.„r.h>d pr iiirt Manaiemem Plan <br />«r >“.™ p E^SS s .*- »«. »«■>«;“' *; <™« -I , <br />jDDrovad ta 1993 The esublished need documented in the approved plan, calls for a reduraon ot <br />Sm ^d nonlpotot soS« pollutant loads to Long Lake and Lake Minnetonka. All of the four <br />project components are consistent with these goals. <br />1. rnnnrv Road Nn 6 Wet D»tPnrinn BasinAVetlandl <br />A permanent access road wUl be construaed along the east side of the two-celled basin to allow for <br />periodic sediment removal from the basins. <br />Of»gf Hill Rnad Wet Detention Basin/Wetl^dl <br />A permanent access road wUI be constructed along the east side of the two-celled basin to all for <br />periodic sediment removal from the basin. <br />3 rifv nf T-nn? T alee Wet Detention Bas/j-fWetly.dsi <br />Not applicable. <br />4. y nny T ake Alum Treatment: <br />Not applicable. <br />30. Related Developments; Cumulative Impacts <br />! Are fumre stages of this development planned or likely? [ J Yes [X] No <br />If yes, briefly describe future stages, their timing, and plans for environmental review. <br />b. Is this project a subsequent stage of an earlier projea? [ ] Yes PQ No t <br />If yes briefly describe the past development, its timing, and any past envtronmemal review. <br />and the other development. <br />31. Other Potential Environmental Impacts If the projea may cause any adverse <br />* which were not addressed by items 1 to 28, idenrijy and discuss them here, along with any prop <br />mitigation. <br />No other potential environmental impacts have been identified at this time. <br />N:^l tJ'<H*3WVLontL*i«JSAW-AES'^Page 22 of 24 5/24/95