Laserfiche WebLink
21. Solid Wastes; Hazardous Wastes; Storage Tanks <br />a. <br />1. <br />3. <br />4. <br />b. <br />23. <br />Describe the r,Tes. amounts, and camposirions of solid or hazardous wastes to be ge^rated. including <br />c^^<dmanurl. sludges and ashes. Idendfy the method and locanon of dispos^. For projects <br />Te^ra^municipal solid waste indicate if there will be a source separation plan; list type(s) and how <br />the project will be modified to allow recycling. <br />Not applicable. <br />Tmirry RnaH Vo f, W.t n.t.mion Ba.'iin/'yedM'ill <br />N'o solid or hazardous wastes will be generated by the projea. Sediment is estimated to aratmulam in <br />i^e tot at a^te of approximately 2.500 cubic yards per year. Sedunent wdl be removed as needed <br />and dispo'cu of off-site. <br />Hill Pnnd Wet pefention B^sinAVetland: <br />No solid or hazardous wastes will be generated by the project. Sediment is estimated to accumulaw in <br />me ttt a^e of approximately 4.000 cubic yatds per year. Sediment wdl be removed as needed <br />and disposed of off-site. <br />rirv of T,nnf T .ilfg Wet netention Basins/Wetland: <br />No solid or hazardous wastes wdl be generated by the project. Sediment is estimated to <br />the ponds at a rate of approximately 1,000 cubic yatds pet year. Sediment wdl be removed as needed <br />and disposed of off-site. <br />T nng Lake Alum Treatment: <br />No solid or hazardous wastes will be generated by the project. <br />Micare the number, location, size and use of any above or below ground tanks to be used for storage <br />of petroleum products or other materials (except water). <br />Not applicable. <br />22. Traffic Parking spaces addedTraffic t'orang spaces uuucu , Existing spaces (if project inwlves ^ <br />Total Average Daily Traffic (ADV generated____Estimated maximum peak hour <br />S^TZ% ^g Far each ejected road indicate the ADT and the <br />of traffic with and without the project. Provide an estimme of the Impact on traffic conge <br />affected roads and describe any traffic improvements which will be necessary. <br />Not applicable. <br />Vehicle-Related Air Emissions Provide an estimate of the effect of the project s traffic generation <br />on air quality, including carbon monoxide levels. Discuss the ^ect of traffic <br />mitigJon measures on air quality impaas. Qf the projea involves 500 or more parkmg spaces, <br />consult 'EAW Guidelines’ about whether a detailed air quality analysis is needed.) <br />Not applicable. <br />Page 18 of 24 5/24/95