My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-26-1995 Council Packet
Orono
>
City Council
>
1995
>
06-26-1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2023 10:48:39 AM
Creation date
10/6/2023 10:46:03 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The City Engineer’s preliminary cost estimate to serve your neighborhood with sewer is <br />$304,000 (about $13,800 per dwelling unit). <br />Because the City is not in a position to assist in the costs to ser\e all 10 identified <br />neighborhoods, a priority has been assigned to each neighborhood. Priority is based on the <br />magninide of existing problems, the number of systems which will likely have to be replaced, <br />as well as the technical feasibility of replacing systems when required. <br />Orono Orchards is rated as the City ’s second highest priority for sewer installation. City <br />financial assistance to help defray the cost of a sewer project in your neighborhood may be <br />possible in a few years when the highest priority areas have been completed. <br />How Does Sewer Fit Into Orono’s Overall "Comprehensive Plan"? <br />All 10 identified neighborhoods are within Orono’s designated "rural" (unsewered) area. <br />However, these neighborhoods are each somewhat unique, having relatively small lot sizes or <br />being adjacent to a lake. And each neighborhood was developed prior to the 1975 zoning <br />changes which required a 2-acre minimum for rural lots, to accommodate septic systems. <br />The City is currently working with the Metropolitan Council to obtain approval for extending <br />municipal sewer to all 10 neighborhoods, which requires amendment of the Comprehensive Plan <br />and MUSA (Metropolitan Urban Service Area) boundary. <br />Please come to the public information meeting on Thursday, July 20th. Results of the study as <br />it relates to your neighborhoods will be presented, and City representatives will be available to <br />aruwer questions. You are invited and encouraged to attend. We want to hear your views <br />regarding the possible installation of municipal sewer in your neighborhood. <br />If you have any questions, please feel free to contact Asst. Planning & Zoning Administrator <br />Mike Gaffron at 473-7357. <br />Enc. - Area Map
The URL can be used to link to this page
Your browser does not support the video tag.