My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-12-1995 Council Packet
Orono
>
City Council
>
1995
>
06-12-1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2023 10:36:34 AM
Creation date
10/6/2023 10:28:55 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Zoning File #1999 <br />May 8, 1995 <br />Page 2 <br />The proposed access stair will be constructed to mwt the standards of Section 10.56, <br />Subdivision 16 (F). The stairs are limited to a 4 ’ width with landings at 4 ’ x 8’. <br />Issues for Consideration • r- i <br />As it is difficult for both the landscape contractor and City Engineer to present a final <br />plan for the restoration of the disturbed areas, members may have problems presenting a <br />recommendation of approval. Your approval can set forth limitations on the restoration plan <br />such as: <br />1. No further expansions in retaining walls, only repairs to ensure stabilization of <br />bank. <br />2. If filling is proposed, applicant ’s contractor shall provide an erosion control plan <br />for Engineer ’s review. <br />3 Hardcover will be reduced in the 0-75 ’ area as only the stair structure and <br />retaining walls will remain. Will additional plantings be required to buffer <br />existing 3’ retaining walls within lakeshore yard? <br />4. Other issues raised by the Planning Commission. <br />** * To either deny, approve or amend applicant ’s plan for the restoration of the lakeshore <br />yard. Any recommendation of approval must include the following conditions. <br />Applicant to apply for a demolition permit for the removal of the boathouse. It <br />shall be applicant ’s responsibility to immediately contact Ac City Engineer to <br />inspect Ae area to determine most practical meAod for stabilization of lakeshore <br />banks and ground cover. <br />Any fillmg wiAin Ae lakeshore yard shall be limited to Aose filling activities <br />needed to provide more gentle, flatter slopes withm Ae area of Ae boaAo^. <br />No oAer areas in Ae lakeshore yard will be filled for Ae purpose of providing <br />natter landscape areas. Filling m those areas will be limited to Ae necessary <br />ground cover to provide consistent/suitable ground cover. <br />Applicant may wish to place gravel or wood chips m restored area once occupied <br />by boathouse. No plastic underliner or geo-technic fabric will be allowed beneaA <br />Ae surface of eiAer Ae rock or wood chip fill. <br />1.
The URL can be used to link to this page
Your browser does not support the video tag.