My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-10-1995 Council Packet
Orono
>
City Council
>
1995
>
04-10-1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2023 9:07:55 AM
Creation date
10/6/2023 9:05:18 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE REGULAR ORONO CITY' COUNCIL <br />MEETING HELD ON MARCH 27,1995 <br />(#11 - 1304 Elmwood Avenue - Continued) <br />Callahan moved, Jabbour seconded, to instruct the City Attorney to act on the <br />prescriptive easement to gain legal easement for the best scenario that exists for the <br />driveway for Mr Nelson. Johnson is to provide an easement at no charge to the City. <br />Nelson is to take the vacation through to the Planning Commission if needed. If not^ <br />needed, vacation to be brought to the Council. Statf will hold up the vacation for 45 <br />days, or until compliance on prescriptive easement, whiche% er is shorter, and notify <br />landowners of the irtitiation of legal action regarding the prescription easement. Ayes 3, <br />Navs 0. <br />(#12) HIGHWAY 12 SAFETY' IMPROVEMENT AND AGREEMENTS <br />Mayor Callahan said he had two contracts before him for signature, and this was the first <br />that he was aware of the amount of money the City was to pay for the semaphore at Hwy <br />12 and Willow Road He asked Moorse to explain how this occurred. <br />Moorse said the City's share of the project cost was estimated to be $75,000 until <br />November of 1994 when the estimate was increased to $230,000. City Engineer Cook <br />said that the holding pond requirements changed over the past years which affected costs. <br />Also, the roadwav was changed fi-om a rural design to an urban design to reduce right-of- <br />way needs. The other $100,000 is for a City improvement project to upgrade North <br />Willow to facilitate the signal. Mn/DOT was unable to do this part because of the <br />easemem and procurement process needed. <br />Callahan said that over the seven years this project was in platming, fi'om the be^nning in <br />persuading the state to approve the signal, to the rearrangement of Orono's end of Long <br />Lake regarding the right-of-way, there has never been any indication of (Drono being <br />charged for the cost of this project. Gerhardson responded that when this was looked at <br />in 1990 and found that more acquisition was needed, he had suggested storm sewers <br />which required less acquisition; but the City knew that they would have to pay the City's <br />portion Callahan said he did not know this. Gerhardson said it was part of the MSA <br />program. Callahan asked if these costs were submitted to the City after the Council <br />passed the budget. Cook said this was so but the funding was from the MSA budget. <br />Moorse clarified the costs for Orono to be $300,000. The costs are reflected in two <br />phases. Jabbour referred to page two of the MSA statement which lists Orono s costs. <br />The joint phase with Mn/DOT reflects a cost of $299,000. Moorse said the agreement <br />with Mn/DOT is broken down in two costs of $158,000 and $41,000, totalling $199,000. <br />The improvements to Willow intersection are an additional $100,000 for a total of <br />$299,000.
The URL can be used to link to this page
Your browser does not support the video tag.