My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-10-1995 Council Packet
Orono
>
City Council
>
1995
>
04-10-1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2023 9:07:55 AM
Creation date
10/6/2023 9:05:18 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(?2 - Review of Proposed Use - Hessburg - Continuea» <br />Church's convent was available but needed to ^"‘1° " ? f-:„ '-There was some <br />The sale was based on receiving permission tor the uSv <br />public opposition The project was not able to meet the deadline <br />Hessbure reported that the Navarre location is in the heart of their service area It is ^ w <br />Minnetonka, allowing children to attend their own schools <br />An offer was made and accepted with the Conservative Baptist Conference ™ <br />'The church offer was for SIdO.OOO with SI 10,000 earned by the church over a <br />fitlyear period The project qualities for Minnesota Housing finance <br />NLXfa“ree?.o"onate SMOO/year for the ne.vt hve years The project also qualifies <br />for funding from the Depanment of Corrections. <br />An architectural drawine of the floor plan was presented. The outside will remain <br />basically the same with the exception of window changes to aUow foi egress m the Iowct <br />Lvd The^^^^ will be a porch on the front. The lower level will be the dormitory ar^ tjmh <br />bedrooms hous^a 20 beds. There will be men and women bathrooms and kitchen <br />and dining facilities on this floor. The upper level will house the <br />areas along with men and women bathrooms. Storage wiU be in the inezzanme area. A <br />landscaping plan will be developed with the City. Fencing is planned for tne rear area for <br />parking and play areas. The outside wiU be Ut by mercury bghtmg. <br />Hessbure outlined the process their project goes through with a victim Th^ 8*‘ <br />from the'police department after the initial arrest. Two advocates in^ with the woman, <br />who is inl'ormed of her riahts and options available. There is generally m order o <br />;m«tlon r^etved from-the coun system. The advocate vvill attend the couri ht^ng <br />Lid assist the victim through the court process. Dunng this time, a safe shelter <br />out and funded through a voucher system. <br />This shelter which will have 20 beds will serve about 7-9 famiUes at one time. There is an <br />average of 2+ children per viaim. The average stay is 17-19 days. <br />Hessburg read to the public a statement of non-violence.
The URL can be used to link to this page
Your browser does not support the video tag.