My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-18-1994 Planning Packet
Orono
>
Planning Commission
>
1994
>
01-18-1994 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2023 1:52:55 PM
Creation date
10/5/2023 1:49:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
To: <br />From; <br />Date; <br />Jeanne A Mabusth, Building & Zoning Administrator <br />Stephen Wcckman. On-Site Systems Manager <br />Januarv 13. 1994 <br />Subject: ^1901 Tandem Propenies - Septic Review <br />I have reviewed the septic system testing and design information for phase 1 (25 lots) on <br />the Coffin and Dickey properties and have the tollovving comments. <br />All 10 of the first phase lots for the Coffin property have been tested and approved for <br />primary and alternate drainlield sites suitable for a 5-bedroom home. These sites meet all soil, <br />topography, drainage and setback requirements of the City of Orona and the Minnesota Pollution <br />Control Agency Standards, Chapter 7080. <br />The 15 lots in the first phase for the Dickey parce’ have tested and approved primary’and <br />alternate drainfield sites suitable for a 5-bedroom home. Of these 15 lots, 13 have draintield <br />sites that meet all soil, topography, drainage and setback requirements of the City of Orono and <br />the Minnesota Pollution Control Agency Standards, Chapter 7080. Lot 2. Block 2 has been <br />granted a variance for an 8% slope on the alternate draintield site and an old well pit must be <br />properly sealed. Lot 7, Block 2 has been granted a variance for an 8% slope on the alternate <br />site. <br />A January 7, 1994 letter from Bonestroo and Associates indicates that an ouilot should <br />be platted alore'the east side of Old Crystal Bay Road for a bicycle trail. Although no trail <br />outlot is shown on the survey, the primary draintield sites tor Lot 2, Block 1 and Lot 3. Block <br />I could be moved east by 5’ in order to allow a trail outlet to be included while still mamtaimng <br />a 20’ setback to these draintield sites. <br />The two parcels have been surveved bv Cotfin and Gronberg. Inc. dated January' 7. 1994 <br />and include all property lines, drainage easements, draintield sites, and home sites used for this <br />review. Based on the above information. I would recommend approval ot the subdivision.
The URL can be used to link to this page
Your browser does not support the video tag.