My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-22-1994 Planning Packet
Orono
>
Planning Commission
>
1994
>
02-22-1994 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2023 1:51:34 PM
Creation date
10/5/2023 1:48:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Orono Planning Commission Members <br />Mavor Callahan and Orono Councilmembcrs <br />Ron Moorse. City Administrator <br />Jeanne A. Mabusih. Building & Zoning Administrator <br />February 17, 1994 <br />#1901 Tandem Properties. 2645.3025 Watertown Road • Preliminary Subdivision <br />- Continuation of Public Hearing <br />List of Exhibits <br />A - Planning Commission Action Notice 1/28/94 <br />B - Richard LaGarde Ixnter <br />Richard Putnam Transmittal to MCWD <br />8420-0520. 0530. 0540. Sequencing, Replacement Plan, Evaluation Criteria <br />E - Wetland Mitigation Summary by Mark Gronberg <br />F - Wetland Maps by Svoboda <br />G - Survey/Topographic Map of Dougan Property (White Oak) <br />H - White Oak Circle Drainage Plan <br />I - Staff Memo 1/14/94 <br />J - Topo Maps of Luce Line Area <br />K - DNR Letter Received 2/17/94 <br />L - Amended Preliminary Plan <br />Status of Application <br />The application was tabled at the Planning Commission’s January meeting pending <br />resolve of downstream drainage concerns, adequacy of culverts under Luce Line, impact of <br />increased runoff from development on ponding areas adjacent to Luce Line and conceptual <br />acceptance of mitigation plan by Minnehaha Creek Watershed Distnct. <br />Staff has been in contact with all icviewing agencies and has received concepnial <br />direction from both the Corps of Engineers and MCWD. The DNR. after a four-hour meeting <br />with applicant and staff, have approved the drainage plans and have agieed to culvert <br />replacement and alteration of the trail to make the stormwater controls work (review Exhibit ). <br />Please review E.xhibit J, the topographic maps of Luce Line area. The southeast culv^ <br />(18") of the Coffin property will be replaced. The DNR has agreed to allow the trail to be <br />lowered approximatelv 1’ allowing for an emergency overflow to assure residents on nonh side <br />of Luce Line will not be flooded. The DNR has asked that direct drainage to ditch along north <br />side of Luce Line on Coffin property be minimized as much as possible because of the inability <br />to widen and deepen ditches because of the steep elevations adjacent to trail. The DNR has been <br />convinced that we are dealing with a very small watershed. Drainage currently exits property <br />at 18 CFS and will be reduced to 1 CFS. <br />The DNR seemed less concerned with the detention pond in the southwest corner of the <br />Dickey property. Runoff currently exits property at about a 117 CFS and alter development wi^ <br />exit at 84 CFS. Drainage will follow along an existing drainage path to die southwest ana
The URL can be used to link to this page
Your browser does not support the video tag.