My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-20-1995 Planning Packet
Orono
>
Planning Commission
>
1995
>
11-20-1995 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2023 10:44:03 AM
Creation date
10/5/2023 8:44:35 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
433
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Rtck St£ V <br />July 31.1995 <br />Paffi 2 <br />A senes of soil borings were drilled to deiennine the jurisditaional w«bnd in the disturbed area. <br />locations oftheee soil bonr^ are shown on the attached Welland Boundary Sketch and descnbed below <br />• Motde Abundance: F - Few (< 2%). C-Common (2 to 20%>. and A-Abundant (>20%) <br />Condnsions <br />The western portion of the site contains a partially deared Palustrine emergont, saturated/seasonally <br />flooded/forested broad-leaf dedduous. saturated (PEMB/C/FOIB; Type 2/3/6 Wrt Meadow. Shallow <br />Marsh, Wooded Swamp) wetland fringe adjacent to Stubbs Bay. The jurisdictional wdland edge appears <br />to be substantially bdow the stakes that represent the boundary of the drainage easement on your property. <br />If you have any questions concerning this delineation, please do not hesitate to call me at 937 5150. <br />Respectfully. <br />WESTWOOD PROFESSIONAL SERVICES, INC. <br />Jay Riggs <br />EnvirontTiental Spedalist <br />Endosure
The URL can be used to link to this page
Your browser does not support the video tag.