My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-20-1995 Planning Packet
Orono
>
Planning Commission
>
1995
>
11-20-1995 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2023 10:44:03 AM
Creation date
10/5/2023 8:44:35 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
433
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PHONE NO <br />STATE OT <br />_^DEPARTMENT OF NATURAL RESOURCES <br />DIVISION OF WATERS, 500 Ufa>ttte Road, St Paul, 55155 <br />296-4800 <br />- ; <br />Pile no <br />e 1S2&Septonber22,1995 <br />Miniidiaha Creek Water^ed District <br />Attn: Michael Panzer ,.^»i <br />Twelve Oaks Center <br />Suite 611 <br />15500 Wayzata Blvii. <br />Wayzata, MN 55391 <br />RE: PERMIT NO 95-6231; LONG LAKE (27-160) IMPROVEMENT PROJECT <br />Dear Mr. Panzer: <br />Attached find a permit that authorizes the portion of the Long Lake Improvement Project requiring <br />a Protected Waters permit fiom the Department (^Natural Roources. Please note that you wiU need <br />a separate approval fi-om the Department’s Division of Fish and Wildlife for the proposed alum <br />treatment of Long Lake. <br />Please read the attached permit carefully and make sure the contractor fiiDy understands all provisions <br />of this permit. Note in particular Spe^ Provision No 1, which roquiw that a plan ^ report on <br />any temporary or permanent spoil disposal plans be submitted to the Regional Hydrologist for review <br />and written approval. The authorized work must not be started unless or until this approval is <br />obtained by you and/or your contractor. <br />Also note that the permit is not valid unless a similar permit is received from the U.S. Army Corps <br />of Engineers. Any mitigation eflfortt worked out with the Corps are also considered requirements <br />of this permit. <br />If you have questions regarding your permit, please contact Regional Hydrologist Dale Homuth at <br />772-7910. Good luck on this valuable public improvement project. <br />J<^L. Stine, Administrator <br />Peimits and Land Use Section <br />JLS/DEH <br />c:USCOE, Joe Yanu <br />Conservation OflBcer, Tom Hemker <br />City of Long Lake, Joe Lynch <br />City of Medina, Jeff Karlson <br />DNR Fisheries, Taylor Polomis <br />Central Waters, Ron Anderson <br />MPCA, Larry Zdon <br />Conservation Officer, Tim Konrad <br />City of Orono, Mike Gafifron <br />Hennepin CD, Ali Durgunoglu <br />DNR Wildlife, Jon Parker <br />Long Lake (27-160p) file <br />AN EQUAL opportunity EMPLOYER
The URL can be used to link to this page
Your browser does not support the video tag.