My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-20-1995 Planning Packet
Orono
>
Planning Commission
>
1995
>
11-20-1995 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2023 10:44:03 AM
Creation date
10/5/2023 8:44:35 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
433
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Zoning File #1958 <br />November 16, 1995 <br />Page 4 <br />Status of Application #1958 <br />The ^)plicant’s original subdivision application was presented to the Planning Commission at <br />their August 19, 1994. The application was tabled as applicant was not present for the review. <br />After the meeting the applicant advised staff that he wanted to add a request for hardcover <br />variances for proposed redevelopment of the property. Applicant failed to proceed with the <br />review of the 1994 subdivision application and has now filed an amended subdivision <br />application that now includes hardcover and setback variances as noted above in the factual <br />findings. <br />Review of Amended Plan <br />Access <br />Review Exhibits H and I, both the City Engineer and Hennepin DOT recommend the shared <br />access to both properties from County Road 15 finding the access to Lot 2 at Dunwoody too <br />close to the intersection with potential for "erratic" and "unsafe weave movements". Proposed <br />lot line can be moved to the west so that the shared curb cut and drive can be placed along <br />the internal lot line (review Exhibit Q). This will also result in major reductions of hardcover <br />in the driveway areas now proposed at 1,750 s.f. in Lot 1 and 2,100 s.f. in Lot 2. The access <br />as shown on Exhibit P in an earlier review was approved by the County meeting adequate <br />separation setback from intersection of Dunwoody and County Road 15 and with the access <br />drive to the County shop area on North side of road, refer to Exhibit C. The County also asks <br />that the most western access be removed at the same time the garage and retaining wail that <br />encroaches the right-of-way of County Road 15. <br />The County report asks for 7 of additional right-of-way dedication for the County Road. The <br />City Engineer in his report. Exhibit 1, asks for 9’ dedication. T dedication would be consistent <br />with a plat approved by *e City in 1982 (Navarro). Shoreline Drive is classified as a collector <br />road in the City ’s comprehensive plan. Collector roads require only a 66’ right-of-way <br />dedication. The dedication of the additional 7 would have a significant impact on the area of <br />Lot 1. It would be consistent for the City to deny the County ’s request for the 7’ of right-of- <br />way as it has in current subdivision reviews where City ’s classification of road right-of-way <br />dedications conflict with the County. The applicant will be responsible for obtaining a <br />Hennepin County permit for the removal of the western drive, garage and retaining wall. <br />Grading/Drainage/Floodplain <br />Review E.xhibits I and O, the floodplain elevation is located close to the shoreline and will not <br />have an impact on fiittire building sites. The City Engineer notes in his repoM hat the sewer <br />line is approximately 8-9’ in depth and will not allow full basements without ci,anging the site <br />significantly with fill. The City has not been provided detail on the proposed new buildings.
The URL can be used to link to this page
Your browser does not support the video tag.