My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-20-1995 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1990-1999
>
1995
>
11-20-1995 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2023 10:44:03 AM
Creation date
10/5/2023 8:44:35 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
433
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTHS OF THE- ORONO PLANNING COMMISSION <br />Mi l l ING HI l.O ON NON LMBI-R 20. I <br />(ffb - #1958 Louis Oberhauser - Continued) <br />Peterson said the plan should come back with less variances <br />Lindquist moved. Smith seconded, to agree with the plat and road change eliminating <br />access from Dunwtxxly A\enuc The new structure requires a revised plan out of the 0- <br />75’ zone and realigned to show the shared access No hardcover will be allowed in the 0- <br />75* A»ne nor structural c»>ver age exceeding Ihe hardcover on Lot I at and Lot <br />2 at 33® o were considered reasonable and the street setback to the garage Mabusth noted <br />that the amended site plan would be required prior to the Council’s formal action on final <br />approval variances N'ote Ayes 5. Nays 0 <br />ACTION ITEMS <br /><#7) #2059 MINNEHAHA CREEK WATERSHED DISTRICT. 14*5 SIXTH <br />AVEM E NORTH - VARIANCES/CONDITIONAL I SE PERMIT- <br />CONTINUATION OF PI BLIC HEARING - 7:39-8:11 P.M. <br />Manager. Ihomas LaBounty, of the M('WD was present <br />LaBounty reported that they have reached an agreement with the Pearces, who are out of <br />town, and plan on signing the agreement the following ev ening <br />Gaffron repinted that the application was tabled at the last meeting pending additional <br />review The stormwater pond would be constructed on the Pearce property, south of <br />County Road 6 and East of Dakota Avenue The site is within the creek from Wolsfeld <br />and Holy Name Lakes which tlow into Long Lake The pond is to be a 2-cell pond whose <br />purpose is to catch sediment and hold back phosphorus. Regular maintenance would be <br />required to keep the pond functioning The site now exists as a flat, wooded, wetland <br />area Mature trees will be removed and replaced with vegetation around the new ponds <br />The MCWD provided "before" and "after" photo representations of the area at the request <br />of the Planning Commission. <br />Gaftron said the City's main concerns are with the construction process. Peterson added <br />there is a concern with hauling of the fill. Gaftron said thousands of yards of fill will be <br />leaving the site to an oft-site location to be determined by the contractor. The access road <br />would be on CoRd 6, east of Tanglewood The excavation and hauling would be done in <br />mid-winter. 1 he sight distance is good at the access location but there is concern about <br />impacting traffic on CoRd 6 Close monitoring of the road conditions w ould be required <br />along with signage and flagmen during construction It was noted that for security <br />reasons, a gate with a combination lock would be provided permanently at the access <br />drive.
The URL can be used to link to this page
Your browser does not support the video tag.