Laserfiche WebLink
{ ^ PERMITS ISSUED/FEES COLLECTED '5P0RT NBR. k1TISS-1 OF RUN 02/01/95 PERMIT ISSw/'J REPORT CITY OF ORONO-- CURRENT RANGE - 01/01/95 - 01/31/95 JANUARY 1995 )PA(?E: 1REQUESTER: CAROLE-- PREVIOUS RANGE - 01/01/94 - 01/31/94GRMIT TYPE QTY BASE FEE VALUATION PLAN REVIEW QTY BASE FEE VALUATION PLAN REVIEWailding GL FAMILY-NEW 3 4,764.00 1. 112,614.00 3,096.61 1 1,026.00 430,320.00 1,106.90F-ADD/REMODEL 9 2,111.00 236,100.00 1,006.81 11 3,169.50 424,550.00 1,690.14 <br />F-ACC STRUCTURE 1 54.00 2,400.00 0.00 0 0.00 0.00 0.00 <br />EMO/PRINCIPAL 3 150.00 0.00 0.00 0 0.00 0.00 0.00 <br />OM-ADD/REMODEL 2 183.00 14,495.00 40.95 0 0.00 0.00 0.00 <br />ub-t * al 10*7,260.00*1,365,609.00*4,224.37*12*4,995.50*062,070.00*2,005.04* <br />‘^chanical <br />GATING SYSTEMS 5 175.00 7,790.00 0.00 16 1,014.10 74,792.00 0.00 <br />rREPLACE 4 191.25 11,100.00 0.00 7 347.50 24,100.00 0.00 <br />GNTILATION 1 35.00 1,200.00 0.00 1 35.00 1,150.00 0.00 <br />UCT WORK ONLY 2 7C.00 1,900.00 0.00 0 0.00 0.00 0.00 <br />GMOVE OIL TANK 1 35.00 1,250.00 0.00 0 0.00 0.00 0.00 <br />ub-total 13*506.25*23,240.00*0.00*24*1,396.60*100,042.00*0.00* <br />lumbing <br />IXTURES 8 665.63 49,500.00 0.00 11 644.01 42,821.00 0.00 <br />ATER METER 0 0.00 0.00 0.00 3 705.00 0.00 0.00 <br />ub-total 8*665.63*49,500.00*0.00*14*1,349.01*42,821.00*0.00* <br />ewer & Water <br />EWER CONNECTION 0 0.00 0.00 0.00 1 35.00 0.00 0.00 <br />AC ONLY 0 0.00 0.00 0.00 1 800.00 0.00 0.00 <br />EWER & WATER 1 70.00 0.00 0.00 0 0.00 0.00 0.00 <br />ub-total 1*70.00*0.00*0.00*2*035.00*0.00*0.00* <br />ign <br />•ER./FREE STANDG 1 35.00 4 0.00 0.00 1 39.00 1,200.00 0.00 <br />•ub-total 1*35.00*400.00*0.00*1*39.00*1,200.00*0.00* <br />'per Defined <br />AND ALTERATION 1 75.00 3,000.00 0.00 0 0.00 0.00 0.00 <br />REE REMOVAL 1 30.00 0.00 <br />0.00 1 30.00 0.00 0.00 <br />•ub-total 2*105.00*3,000.00*0.00*1*30.00*0.00*0.00* <br />Jrand-total 43**0,649.80**1,441,749.00** 4,224.37** <br />54**0,645.11**1,006,933.00**2,885.04**