My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-23-1995 Council Packet
Orono
>
City Council
>
1995
>
01-23-1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 4:05:49 PM
Creation date
10/3/2023 4:04:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Orono <br />Kelly Avenue Area <br />Storm Drainage Improvements <br />January 1995 <br />Xusessmenifi <br />We would recommend that ihe project costs as outlined be charged to the benefitting property <br />owners based on benefit received. The benefit can be calculated on an area basis of the property <br />that has direct ruiwff to the drainage area. The total drainage area of appro.ximately 35 acres will <br />benefit from the improvement. <br />Conclusions and Recommendations <br />The drainage improvements presented in this report are feasible as related to engineering <br />principals and construction practices. We would recommend option E because it minimizes the <br />impact on the neighborhood and it provides good Water Quality Management. We would also <br />recommend raising Kelly Avenue two (2) feet to elevation 932.5. <br />The following recommendations are presented for consideration by the City council; <br />That this report be adopted by the City of Orono as a guide for construction of the <br />proposed improvement. <br />That the City televise the sanitary sewer line on Kelly Avenue where the fill is to <br />be placed. <br />That the City investigate funding alternatives with established policies for storm <br />water projects. <br />Ihat the City hold an information meeting with the neighborhood prior to initlatiri^ <br />the project. <br />That the City conduct a legal and fiscal review of the proposed project prior to a <br />public hearing. <br />That the cost of the improvements be allocated equitably among the parcels in the <br />study area receiving benefit. <br />Bonestroo, Rosene, AnderUk Jc. Associates, Inc. <br />13976.rpt
The URL can be used to link to this page
Your browser does not support the video tag.