Laserfiche WebLink
CITY OF ORONO1995 BID TABULATIONS FOR STREET MATERIALS & EQUIPMENT RENTAL <br />ALL QUANTITIES ARE BID IN TONS - EQUIPMENT IS BID PER HOURLY RATE <br />BACKHOE BACKHOE BACKHOE <br />PER HOUR PER HOUR PER HOUR <br />CY RATE CY RATE CY RATE <br />Schoening Excavating '/2 50.00*%60.00* <br />3/4 TON PICKUP <br />W/8 PLOW PER HOUR <br />I Sclu>ening Excavating 34.00* <br />jj Allied Blacktop 50.00 <br />Denotes low bid <br />WHEEL LOADER <br />PER HOUR <br />WHEEL LOADER <br />PER HOUR <br />WHEEL LOADER <br />PER HOUR <br />CY RATE CY RATE CY RATE <br />Schoening Excavating 2 50.00*3 60.00* <br />Allied Blacktop 4 85.00*