Laserfiche WebLink
4. Monitoring Plan <br />MCWD agrees to develop and implement a water quality monitoring plan <br />("Monitoring Plan”) which will identify the specific sampling procedures, analytic methods, <br />detection limits, quality assurance and quality control procedures in order to facilitate the <br />accurate measurement of baseline data and any changes in water quality throughout the Long <br />Lake subwatershed for the duration of this project The Monitoring Plan shall be submitted <br />to the Project Advisory Committee described in paragraph 5.1 of this Agreement on or before <br />May 1, 1995 for review and comment by all parties to this Agreement before any actions <br />implementing the Monitoring Plan are commenced. On or before June 1, following review <br />and comment by the Project Advisory Committee, the Monitoring Plan shall be agreed upon <br />and adopted by all parties as an amendment to this Agreement The MCWD shall be <br />responsible for the selection of a qualified laboratory to perform the data analysis required by <br />the Monitoring Plan and shall be responsible for the costs of the laboratory sample analysis. <br />5. Project Advisory Committee <br />5.1. A Project Advisory Committee shall be created to provide technical consultation <br />on engineering and environmental aspects of projects developed under this Agreement to <br />provide comments and technical advice on the Monitoring Plan described in paragraph 4 of <br />this Agreement and the designs, plans, and specifications of each project component and to <br />provide preliminary consultation to the parties on specific technical matters that will <br />eventually be submitted to one or more agencies for a permit or other approval. The Project <br />275/14070525 1/10/95