Laserfiche WebLink
MINlfTES OF THE ORONO PLANNING C OMMISSION <br />MEETING HELD ON SEPTEMBER 18, 1995 <br />(«IS> #2070 L. E. BRUECK;EMAN companies , 372 HESTl^KE STREET - <br />SKETCH PLAN OF PROPOSED T^O LOT SI BDIVTSION - Pl’BLIC <br />HEARING <br />The Cetlificate of Mailing and AflKlavit of Publication noted. <br />Developer Loren Brueggeman and property oivncr. Dean Maeser, wTrc present <br />Tlw property in question is located on Westlake Street The sketch plan is a review of a <br />proposal lot liiw rearrangement or replat to result in two building sites frt>in a 1 99 acre <br />group of 3 tax parcels This property is l<x:ated in the single family lakeshore residentiai <br />2-acre zoning distnet requiring 200' width minimums The home currently on the property <br />overlaps lots 10 and 11 with a storage-type building on lot 11 Two rental cabins overlap <br />lots 11 and 12 but are mainly located in lot 12 The property currently operates as one <br />single property One sewer unit was assessed to the existing house but not granted to the <br />cabins, w hich are non-conforming and are in need of removal Council directed the <br />applicant earlier this year to connect the house to sewo^ and allowed the cabins to remain <br />in use for two more years before they must be removed The cabins are using the septic <br />system on the property, and the house must be connected to sewer immediately. The cost <br />of connecting to sewer is $ 14,000 per unit <br />The applicant decided to pursue a lot line rearrangement or replat of the property into two <br />building sites The lots would meet the required setbacks with 50* front and 30' side but <br />would create a back-lot situation. The potential rights of the owner to have an additional <br />building site would be much greater if each existing lot w^ buildable but they are not as <br />many variances would be neoled. If a back lot were created and replatted, it would not <br />meet the 150^« requirement Lot area variances would be required The lot width as <br />noted in case 1 is dependent on the 75' line but would probably meet the lot width <br />required The lot coverage by struaure allowance is limited by hardcover maximums. An <br />average lakeshore setback variance would also be required. <br />In the question of a replat, would the City allow a narrow corridor to access the back lot <br />or would 30' be required as per the code'!’ It is questionable whether two parcels would be <br />allowed in this 2-acre zoning. The lots use currently overlaps resulting in the 3 lots <br />functioning as one properly If a subdivision is not possible. City questions what relief <br />could be given to the owner. Would it be possible to sell larnl to a neighbor? <br />Developer Brueggeman passed out sketch plans to the Commissioners showring two <br />potential building sites on rearranged parcels meeting hardcover requirements. One site <br />would contain a 2-story residence, 3300 s.f, and the second site would contain a 4400 s.f <br />footprint with a walkout rambler style home, square footage of which would be 4000+ s.f. <br />with both upper and lower lev els Both would be on substandard lots but would be <br />sellable according to Brueggeman <br />30