My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-18-1995 Planning Packet
Orono
>
Planning Commission
>
1995
>
09-18-1995 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2023 2:43:28 PM
Creation date
9/28/2023 4:30:44 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MC^T) <br />Julv 18, 1995 <br />p. 2 <br />„i,.„o.«, o™ "s” S—.h-. <br />mitisation nnv be accwptable sinCw <br />. I nm=d d,. presence of norrPem pike in <br />Road 6 last year. A f.sh bamer this have any <br />:-::;:pa“^“ <br />travelma upstream? <br />- Exr;.rrxi:i ‘“s.s;=^ <br />priority. <br />The Citv is concerned about transportation of dredge spoils on County Road 6 <br />^dMke County Road 6 even mote treacherous than tt is m normal wmter <br />conditions. <br />. It may be appropriate that a gate be instaUed at the entrance to the service <br />driveway to preclude public access to the site. <br />Andrew Svvetson was advised to provide as pan of the CUP/vatiance <br />J^plication evidence that other similar pondmg projects have successfully <br />resulted in phosphorus reductions in downstream waters. <br />period ff pLible rather than the notmal one year period, to avoid the need <br />,nnnu-^l renewals in the interim. <br />o „ hi,< acknowledged a number of the above concerns in his letter of July 5, <br />^^«'*ASnal concerns or questions may be raised by the Planning Commission and
The URL can be used to link to this page
Your browser does not support the video tag.