Laserfiche WebLink
Joe Yanta <br />Army Corps of Engineers <br />Seutember 6, 1995 <br />Page <br />St;~uc.giral Alierr.a tn'ffj <br />f. <br />b. <br />Deter, tier. Easinr <br />Aernion <br /># <br />Agency (MPCA) goal for water quality. The implementation plan --eeommend., - . <br />Construction of a 4.0 acre wet detention basin at Deer Hill Road. <br />Construction of an 8.0 acre wet detention basin at County R.cadl'To. 6. <br />Hypo'imretic aeration with ferric chlor.de addition. <br />. Admimstrative and non-structural BNtPs inclusive of urban ferulizer manap.en:-;.!*. ya':- <br />and livestock management, agricultural soil cc.nservatton practices an . street, vuu.n.s. <br />The completed implementation plan estimated project cost at 3.3 rrdllion dollars. Due to concarP.s <br />about the overall cost of the project, the MCVTO modified the project -n a September 19^^4 <br />Feasibility Report to include the following project componenis. <br />Construction of a 5.5 acre wet detention basin at County Road No. 6. ^ ^ <br />HrJargemenc of two e;dsting sedimentation basins by a tctr.l of O.u 1 acre: in o -a /.'y vi <br />Long Lake Park. <br />Hypolimnetic aeration with ferric chloride addition. <br />Cooperative agreement v/ith the cities of Long Lake, Medina, and Oreno reqm -.rg <br />develop.ment of policies and disseminating mformatton on VJ^/^?s. <br />V'“ MCWT? in the revised i.mplementation pic i estimates that the oroject v.-ill reduce pncsohcr.u* <br />concentration in Long Lake to 70 ug/1 at a cost of approximately 1.4 million dollars. <br />The MCWD ruriher evaluated and modified the project to address two major issues- <br />j Inability of the MCWD to obtain required land rights needed to construct a :).5 -.ere <br />basin on the County Road No. 6 site. Per a negotiated settlement agreerner t^a sma.ihr <br />2 5 acre bru-in was agreed to. This required the MCWD to include the Deer --uJ ..‘CiC. <br />site as part of the implementation plan. The Deer Hill Road site had initially oaen <br />viewed as a second phase of the project. <br />O <br />N ^JlS:\04-;09VWOIU7^liVD4««5 MEM-AKS Ifv