Laserfiche WebLink
B. water quality modeling <br />The total phosphoais removal efficiency for the Cit> Park wet detention basins/wetlands is <br />approximately 20 percent. Phosphorus removal efficiencies were estimated using the Pond <br />Net Detention Pond Model (See Appendix D for water quality mode! input and output data). <br />C.aitASliMil VG REOUTRENfENTS <br />The City Park wet detention basins/wetlands will require the following permits: <br />1. U.S, Army Corps of Engineers (COE) Section 404 Nationwide Permit Number <br />26. <br />2. DNR Protected Waters Permit. <br />3. City of Long Lake approval. <br />4. Submittal of DNR permit application to the mayor of Long Lake and the board <br />of supervisors of the soil and water conservation district. <br />M:i)l U>04>3ai\0r«ipi.XfT'A£S*lhr