Laserfiche WebLink
Section II , j <br />County ^ Detention Basin/Wetjand <br />\VfT DETT^nN BASrV/^^"gTXANB <br />1. ppcign Cof vnderaDoni <br />. ..o ceU w« detention «.dand .dU de «ed on priva. <br />connoence of *e nonheas. .-.d r.onhwcs. tnbouncs draining to Long <br />.P .0.0,0 waa nogooa,od . .0 o,„.e - <br />sotuemon, agroomon, ^.ih thoj^and ow 0 ,ons.naction was delayed 2 years. <br />60% from the original proposal m the feasibility stuoy ^rtaiaonai wet <br />TO augment the numient and sediment removal of the new basin designs an ad^Lon^ t <br />de-ention basin/wetland originally envisioned as a 2nd phase wUl be consffuct m ^ <br />northeast tributary at Deer Hilt Road in Medina (see Section IH). Final design p <br />contained in .appendix A. <br />. •„ h- at elevation 950.4. Maintaining a permanentA permanent normal pool will be create at eievauon <br />normal pool is important for the followmg reasons; <br />events. <br />The permanent normal pool increases sedimentation efficiency and reduces <br />sediment transport by dissipating runoff energy. The pool perimeter and berms <br />i