My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-18-1995 Planning Packet
Orono
>
Planning Commission
>
1995
>
09-18-1995 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2023 2:43:28 PM
Creation date
9/28/2023 4:30:44 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
n^r Hill Road <br />A tuo cell ue. detention basLVwedard .s proposed lo be constrccted «thln a i:.08 acre easem.o. <br />u r.--. Uiii Ro^,H The abovc basin v^iU have a surface area ot on private propenj- sooth ot Dee. HiU Road. ^ of 7,5, <br />approxintately 6.1 acres. The project wiU impact a total ot 7.67 acres ' <br />acres of PE.MBd (Type 2) and 0.15 acres of PUBF.S (Type 4). Every effort has een ma <br />H allies on the site while still providing for the required water maximize the wetland function and values on the site wnue 5 f ^ <br />u • . 1 mr. The basin system is a flow through system so there is nocualitv ireatmem wet basin volume. Th y • a t r <br />Lonce in water levels In e.ther of the two ceUs. Tftc second ced wall recetve J “ “ <br />havinv passed through the first ceU. In addinon, the exishng wetland has been arttfictafiy dnc <br />and therefore the proposed project can be considered in part a restoration prc,^t. <br />suitable for submergent and emergent vegemtion wiU total 4.11 acres (not mcludtng 1.54 ac«s o <br />wooded wetland mitigation area). Much of the above area ,s thought to be ot higher v ue » <br />existinv Tvpe 2 wetland and the proposed project has more wetland diversity that what currently <br />exists °The MCWD has budgeted $75,000 for planting of wetland vegetation. In addition to the <br />above fringe weUand, the project conmins 3.74 acres of deep water habitat (depths grea^^ 6.5 <br />feet) The total wetland and deepwater area is 9.4 acres (1.73 acres larger than the <br />wetland area). By considering the deepwater area from the second cell (3.43 t^ « ‘ <br />as mitigation and applying 0.13 acres of the wooded wetland mitigation towards the Deer Hil <br />Road wetland impacts, the M(TOT3 feels the project is self mitigating. <br />Siiminary <br />“ zr rjr <br />provide water quality treatment for a majority of the drainage within the Uing Lalte Subwatershed. <br />To feasibility treat regional drainage for this Subwatershed wetland impacts are unavoidable. <br />.S:«l»3^3»^UY06l?5XT«rA£S-^f•
The URL can be used to link to this page
Your browser does not support the video tag.