My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-17-1995 Planning Packet
Orono
>
Planning Commission
>
1995
>
04-17-1995 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2023 3:44:01 PM
Creation date
9/27/2023 3:40:04 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br />TO:Jeanne Mabusih. Building and Zoning Administration <br />FROM: Stephen Weckman. On-Site Systems Manager <br />DATE:April 5, 1995 <br />SUBJECT: Application #2007. Tony Eiden - Site Review <br />The applicant proposes the addition of a privacy berm along Watertown Rd. on lots 1 and 2. <br />block 2. Old Cry stal Bay Road Addition. The berm is nearly complete as work was initiated <br />w ithout a permit using fill material from other lots in the same subdivision. <br />Staff recommends some alterations to the berm size and site drainage if the berm construction <br />is permitted. As the berm location is between two drainfield sites, a twenty foot setback must <br />be maintained from each site. This setback is necessary to direct surface water away from the <br />drainfield sites. The excavation of a ditch on the north side of the berm, adjacent to <br />Watertown Rd. is also recommended to direct surface drainage west rather than across the <br />middle of the applicants property. Currently surface drainage will flow from the three lots <br />west of lot 1 across the middle of the lot between the house and drainfield sites. <br />The applicants representative has agreed to the above staff recommendations
The URL can be used to link to this page
Your browser does not support the video tag.