My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-17-1995 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1990-1999
>
1995
>
04-17-1995 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2023 3:44:01 PM
Creation date
9/27/2023 3:40:04 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NflNUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON APRIL 17. 19«)5 <br />(#6 - #2009 Tom & Maureen Palm - Continued) <br />Schroeder nx)ved, Liixlquist seconded, to approve Application #2009 with the principal <br />structure meeting the 50* setback Schroeder noted the existing variartces. the effort by <br />the applicant to reduce hardcover, the hardships of the lot, the impracticality of setting the <br />new construction at the 75' mark, and the fact that the drainage is away from the lake <br />Ayes 5, Nays 2, Rowlette and Smith, both prefer the 75' setback <br />(#7) #2012 JAMES JUNDT, 1420 BRACKETTS POLNT ROAD • VARIANCE - <br />PUBLIC HEARING 8:10-8:23 P.M. <br />The Certificate of Mailing and Affidavit of Publication were noted <br />Scott Crawford of Kraus Anderson Construction represented the applicant. <br />Mabusth reported that the application is for repairs to the oversized accessory structure <br />with the expanaon of the roof area This guesthouse portion of the structure is adjacent <br />to the greenhouse area, and the new roof will be at the same height as the greenhouse roof <br />line A conditional use permit for the caretaker house was approved in 1993 The last <br />issue involving this structure did not involve the guesthouse portion of structure located <br />within a sub standard side setback Now, because of structural repairs being done, a side <br />setback variance is required <br />Crawford reported that the plan is for roof expansions, roof repairs, repair, replacement of <br />windows, tuckpoiming. and new guttm. <br />Lindquist asked what is going to be done with the peaked roof area of the structure. <br />Crawford advised an apartment now exists and an expansion of the living area is planned. <br />The structure would be used for guests only. <br />There were no public comments. <br />Peterson reiterated the need for an overall plan to eliminate separate issues coming before <br />the commission each month. <br />Rowlette moved, Lindquist seconded, to approve Application #2010 for a side setback <br />variance and repair to the oversized accessory structure Ayes 7, Nays 0. <br />(#8) #2011 TIM & LORI LINE, 4415 FOREST LAKE LANDING - VARUNCES - <br />PUBLIC HEARING 8:23-8:59 P.M. <br />The Certificate of Mailing and Affidavit of Publication were noted
The URL can be used to link to this page
Your browser does not support the video tag.