Laserfiche WebLink
ORONO PLANNING COMMISSION MEETING <br />MINUTES FOR i\L\RCH 20, 1995 <br />ROLL <br />The Orono Planning Commission met on the above date with the following members <br />present; Chair Charles Schroedcr. Stephen Peterson. Sandra Smith, Dale Lindquist. <br />Candace Rowlettc, Charles Nolan, Jr, and Janice Berg Building and Zoning <br />.Administrator Jeanne Mabusth and Recorder Sherry- Frost represented Stall <br />Councilmembers Jabbour and Goetten were present. Chair Schroeder called the nweting <br />to order at 7:00 p m <br />SCHEDULED PUBLIC HEARINGS/PUBLIC lNFOR>L\TION MEETING <br />(#1) 7:00 P.M. #2000 CORTLEN G. CLOUTIER, 2480 CASCO POINT ROAD - <br />PRELIMINARY SUBDIVISION, CLASS I - PUBLIC HEARING 7:00-7:53 P.M. <br />The Certificate of Mailing and Affidavit of Publication were noted <br />The Applicant, Mr. Cloutier, was present <br />Mabusth reported that the application is for a division of legally combined lots 1, 3,4, and <br />outlet 1, which is a type 1 classification of subdivision. These lots were origin^ly <br />combined for tax purposes. The applicant is asking for a division of Lot 1, which meets all <br />requirements. The issue is access The existing access will serve lot I The access <br />currently serves the homestead parcel. The drive would be altered to only serve lot 1, wd <br />the homestead parcel (combined lots 3 and 4) will be served by existing drive at Fredmck <br />Street. When the land was subdivided, an outlot (20' wide) was created within the Tillson <br />Villa Carman subdivision Lots 1 -4 could gain access from the road outlot and lot 5 from <br />Frederick Street. Today, lot 2 achieves access from outlot and combined lots I, 3, and 4 <br />from direct accesses at Casco Point Road and Frederick Street. <br />At this time, Mabusth commented that it was important to determine what are the future <br />plans for the lots, mainly, if there would be a future division of lots 3 and 4. The nw lots <br />must meet requirements of current code and provide approved legal access. There is <br />adequate area to subdivide lots 1, 3, and 4. The required area for each lot wnll depend on <br />whether the lot will achieve access via a private road or driveway outlot. Lot I has access <br />fixjm Casco Point Road from an existing approved curb cut. Lot 4 has an existing access <br />from Frederick Street. The code states that only two lots can be served from a driveway <br />outlot and that the back lot meet 150% of required area. <br />The lines of existing sewer and water service to residence would need to be located and <br />shown on survey. The location for the water connection for the original house is <br />unknown. The sewer may come from Casco Point Road. There may be a need for an <br />easement depending on their locations. A municipal sewer line intersects lot 4 at the <br />northwest comer The City would ask for an easement over the sewer line.