Laserfiche WebLink
Zoning File #2011 <br />April 11. 1995 <br />Page 4 <br />Options of Action <br />To approve or deny as proposed: or <br />To approve as amended. <br />Anv condition of approval must include the following conditions; <br />1.Prior to the filing of an application for new construction, applicants must apply <br />for the legal combination of the five separate parcels that make up the building <br />sue. <br />2.Upon application for a building permit, applicant will make payment for a sewer <br />connection charge at $11,744.50 per 1995 fee schedule and a SAC payment of <br />$850.00 based on MWCC’s 1995 fee schedule. <br />3.The City shall require permits for the installation of the drainfield and extension <br />of municipal sewer to residents. Applicants’ consultant/contractor shall provide <br />all design and spec information for the review of the City Engineer. <br />6