My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-15-1995 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1990-1999
>
1995
>
05-15-1995 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2023 3:33:22 PM
Creation date
9/27/2023 3:28:27 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON MAY 15, 1995 <br />(#4 - #1999 David & Vicki Mckerman - Continued) <br />Nolan was concerned with the stabilization of the slope. It was noted that once the <br />boathouse is removed, timing is critical. Nolan did not want the application to have to go <br />through the Planning Commission process prior to stabilization once the boathouse was <br />removed. <br />The Applicant responded that Bill Niccum of Minnetonka Portable Dredging will demolish <br />the boathouse and fill with a clay/dirt combination with dirt on top and attempt completion <br />within a day Mabusth noted that the City Engineer would need to be there when this was <br />done to see that guidelines were followed. Mabusth asked the applicant to inform Staff of <br />the date and time for the demolition. <br />Nolan asked if the slope could be stabilized without a retaining wall. Mabusth said the <br />Engineer thought this was possible as the rest of the ground appears to be stable, and <br />loose earth and debris appear to have been swept to rear of boathouse giving the <br />appearance of severe erosion Mabusth also said that the area where the boathouse is now <br />located is level. <br />Both Peterson and Berg said the Planning Commission would rely on the expertise of the <br />City Engineer. <br />The Applicant commented that they proposed to use crown vetch in the lutdscaping. <br />There were no public comments. <br />Smith moved, Lindquist seconded, to approve Application #1999 with Staff <br />recommeiKlations, and specifically, that the City Engineer be on site when the boathouse is <br />removed. The Applicant is to work with the Engineer on steps taken to stabilize the <br />slope. Plans must be acceptable to the Engineer. Ayes 5, Nays 0. <br />(#5) #2005 SAILORS WORLD MARINA AND BOAT CLUB, 1955 SHORELINE <br />DRIVE - CONDITIONAL USE PERMIT - CONTINUATION OF PUBLIC <br />HEARING <br />Application #2005 was tabled at the request of the applicant. <br />(#6) #2007 TONY EIDEN COMPANY, 2800 COUNTRYSIDE DRIVE WEST <br />CONDITIONAL USE PERMIT - CONTINUATION OF PUBLIC HEARING <br />7:42-7:54 P.M. <br />Ross Lineham represented the company. <br />1
The URL can be used to link to this page
Your browser does not support the video tag.