My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-15-1995 Planning Packet
Orono
>
Planning Commission
>
1995
>
05-15-1995 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2023 3:33:22 PM
Creation date
9/27/2023 3:28:27 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
KfINUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON MAY 15, 1995 <br />(#10 - #2017 William Hibbs - Continued) <br />Nolan acknowledged the need for an apron on the drive but asked tlutt area limitatioAS be <br />set Mabusth said the back-up are was included in the hardcover pr<^)osals The detailed <br />site plan will be subtnitted prior to the application going beftM’e the Council. <br />Nolan moved, Lindquist seconded, to approve Application #2017 for variances to <br />hardcover, structural coverage, side and street setbacks subject to apron dimensions being <br />established before going to the Council meeting. Ayes 5, Nays 0 <br />(#11) #201S RICHARD BORN, 1991 EAGERNESS POINT ROAD - <br />CONDITIONAL USE PERMIT - PUBLIC HEARING - 9:33-9:37 P.M. <br />The Certificate of Mailing and Affidavit of Publication were noted <br />Mr. Bom was present. <br />Mabusth reported that the application is for a CUP to install a permanent dock. The dock <br />is existing but the applicant is asking to expand it. There are no setback problems The <br />DNR has issued a permit, which StatThas received a copy The applicant will need to <br />review his proposal with the LMCD. The applicaitt responded that he has begun this <br />application process <br />Mabusth commented that the visiting Planning Commissioners remarked on the <br />construction oftherailirtg on the upper deck. A permit was issued for a new rail. The <br />original rail was of solid construction. The new railing will be more open Approval was <br />given in 1991 for this construction <br />Nolan commented on the landscaping on the lakeshore portion of the lot, which has plastic <br />underlaymem. The Applicant responded that this was installed when he bought the <br />property. Peterson informed the Applicant that the plastic is considered hardcover and <br />would be desirable if removed. <br />Lindquist moved, Berg seconded, to approve Application #2018, subject to LMCD <br />approval. Ayes 5, Nays 0. <br />(#12) #2019 LEISEL COX, 3445 SHORELINE DRIVE - CONDITIONAL USE <br />PERMIT - PUBLIC HEARING 9:37-9:43 P.M. <br />The Certificate of Mailing and Affidavit of Publication were noted. <br />Leisel Cox was present.
The URL can be used to link to this page
Your browser does not support the video tag.