My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-15-1995 Planning Packet
Orono
>
Planning Commission
>
1995
>
05-15-1995 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2023 3:33:22 PM
Creation date
9/27/2023 3:28:27 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
opportunity to adopt a more enterprising program philosophy than heretofore possible, <br />Foundation will move its offices into the Institute and manage the conferencing facilities, <br />laboratories and office space, while continuing its current programs and publications. Return <br />of the Institute to the Foundation also offers the opportunity of making the facility more <br />accessible for local public activities needing such accommodations. For example: <br />• Tbe Institute can continue to be the current Navarre Polling Place. <br />• Freshwater Foundation outreach programs, such as Breakfast Talk on Aquascaping <br />on April 27, will have a permanent point of origin. <br />• Conference facilities contained in the Institute will continue to be available for more <br />general public use. <br />• Precollege and college level summer programs will continue. <br />While the Foundation already owns the 2.5 acre lot (PID # 20-117-23-11-0038) on the <br />immediate south border of the Institute lot (PID # 20-117-23-11-0034), it has no plans m <br />alter either lot at this time. The Foundation is also aware that the parldng lot is not paved, <br />and options for either paving or marking the existing area for parking wall need to be <br />examined. <br />Pre«;ent Status of the Property Transfer <br />The discussions with the University are well underway and are quite cordial. Needs and <br />expectations have been exchanged between the two parties and a tentative agreement is <br />expected well before the planned July 1, 1995, closing date. The proposal has been <br />submitted to the Facilities Committee of the University Board of Regents for consideration <br />April 6 and will be submitted to the Freshwater Foundation Board of Directors after final <br />Board of Regents action. <br />In summary, the Gray Freshwater Biological Institute has been an important asset for the <br />City of Orono for 2*6 years. The Freshwater Foundation now has the opportumty to <br />continue and build upon its value to the City while furthering the interest and dedication <br />of our citizens to protect and manage fresh water, one of our most indispensable resources. <br />3/24/95
The URL can be used to link to this page
Your browser does not support the video tag.