My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-20-1995 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1990-1999
>
1995
>
03-20-1995 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2023 3:30:43 PM
Creation date
9/27/2023 3:26:26 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON MARCH 20, 1995 <br />(#S - #2001 - PoM^der Packers, Inc /Rhonda Wilson - Continued) <br />Peterson commented that the plans arc consbteirt with the neighborhood. He voiced <br />concern with the location of a water pipe he saw that was located close to the sewer It <br />was reported that the pvc pipe was buried and came up at this point and fed off the main <br />well but adequate distance separated the well and septic <br />Smith inquired of the deadline date for sewer connection. The applicant said that although <br />the number of bedrooms increased from 3 to 4, this did not increase the square foou^. <br />Applicam did note that the sewer would be updated during 1995 <br />Mtd)usth reported seeing water pocketing near the culvert on the westside in the ditch <br />area. The culvert will need io be checked to ensure it is working properly. <br />Smith noted that the tennis court is non-conforming A variance would be required if any <br />striictural changes would he needed <br />Rowlette moved, Lindquist seconded, to approve Application #2001 for front street <br />setback variance with the three conditions listed pertaining to the septic, the culvert, and <br />the tennis court. Ayes 7, Nays 0 <br />(#6) #2003 ART AND KATHY HENNINGSEN, 975 TONKAWA ROAD • <br />VARUNCES - PUBLIC HEARING 0:30-0:54 P.M. <br />The Certificate of Mailing and Affidavit of Publication were noted. <br />The Applicants, Mr. and Mrs Henningsen, were present. <br />The application is for an average lakeshore setback variance. The screen porch and deck <br />improvements are all located in front of the average lakeshore setback line as are portions <br />of the house Because of the shape of the property, the hardcover improvement is <br />concentrated in the 75-250'zone. Hardcover exists at 32.49%. 1052 s.f of new <br />hardcover is to be added and 1184 s.f of hardcover is to be removed. 712 s.f. or 2.8% of <br />proposed structural hardcover shall be traded writh the removals of 1184 s.f of <br />nonstructural hardcover. The grade level patio has not been included as structural <br />hardcover. The brick patio is being remo>^ as part of hardcover tradeoffs. The property <br />is 2.3 acres in LR-IB zoning district, requiring one acre in area. <br />The impact on the lake view for the neighbors was discussed. There has been no problem <br />voiced Council member Jabbour, who is a neighbor, commented that he has no problem <br />with the home location. Rowlette commented that the Gilbert family, neighbors of this <br />property, hadn't voiced any concern, and had also received the same average lakeshore <br />setback variance.
The URL can be used to link to this page
Your browser does not support the video tag.