My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-22-1995 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1990-1999
>
1995
>
02-22-1995 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2023 3:31:02 PM
Creation date
9/27/2023 3:26:00 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO: <br />FROM: <br />Jeanne A. Mabusth, Building & Zoning Administrator <br />Stephen Weckman, On-Site Systems Manager <br />DATE: February 7, 1995 <br />SUBJECT: Application #1995, Frank Kokesh - Septic Review <br />• in 1Q78 snd uDsnidcd in 1981 is not f^iiling, but h^s a high <br />The existmg inventory card shows the system is Conforming, but that the <br />potenual for failure. In 1 1983 Michael Gaffron noted that drainage tuns across the <br />soils are poor due to wetness^ observed until inspections in <br />to r^h potential for failure due to problems obsened m 1991 and 1993. <br />SOU borings ^ <br />ihe drainfield to 7 or a^t the time the system fails, whichever comes <br />system must ^ primary and alternate sites have been identiried. <br />first. Due to the T^SToom resiS^wi* an additional bathroom in the bam. <br />City approval. <br />necessary. <br />Based on the above information, this site is suitable for subdivision.
The URL can be used to link to this page
Your browser does not support the video tag.