My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01025 - demo
Orono
>
Property Files
>
Street Address
>
L
>
Leaf Street
>
50 Leaf Street - 04-117-23-22-0003
>
Historic Property Files - 3195 Watertown
>
Permits/Inspections
>
2016-01025 - demo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:09:06 PM
Creation date
9/26/2023 3:31:05 PM
Metadata
Fields
Template:
x Address Old
House Number
3195
Street Name
Watertown
Street Type
Road
Address
3195 Watertown Rd
Document Type
Permits/Inspections
PIN
0411723220003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NO\ PRINCIPAL STRUCTURE DEMOLITION PERMIT <br /> ZONING DISCLOSURE & DECLARATION <br /> y ;? To the property owner: Demolition of the principal dwelling structure on a property may <br /> elG 0*:<<;r' automatically terminate certain rights which may have accrued to the property by virtue of the <br /> KCSH <br /> continued existence of that building. This means you may give up some or all of the zoning rights <br /> currently associated with the principal structure(setbacks, hardcover,size of building,etc)with Its removal. <br /> • Rebuilding on a substandard lot of record (i.e. a lot that does not meet the zoning district required lot area or width <br /> standards) may, with few exceptions, require variance approval by the City Council, and such approval is neither <br /> automatic nor guaranteed but requires that a practical difficulty be demonstrated. <br /> • Additionally, all current zoning standards will have to be met by the new principal dwelling including setbacks, and <br /> building footprint,hardcover(impervious surface),&height limitations,etc. <br /> • Where municipal sewer is not available, provision of two(2)conforming on-site septic treatment sites is mandatory for <br /> a new dwelling. <br /> • Unless specifically approved by the City, all seasonal and permanent docks must be removed at the time of <br /> principal dwelling demolition. They may not be re-installed until a new principal dwelling has reached the framing <br /> stage. <br /> The following information is presented for the purposes of advising the property owner of the implications of removal of <br /> the prinelpal dwelling on the property: <br /> 1. Property Address: 3195 Watertown Road PID# 04-117-23-22-0003 <br /> 2. Zoning District: RR-1B Required Lot Area: 2 acres Required Lot Width: 200' <br /> Shoreland? Y N Actual Lot Area: 0.98 acre* Actual Lot Width: 170'* <br /> *According to Hennepin County <br /> Lot area varian required. Lot width variant required. <br /> 3. Required Setbacks: Front 50` 1 Rear 50' 771de 30' Side Street I 50' <br /> Lakeshore Lot: I Lake(Front) NA Street(Rear) NA <br /> Average Lakeshore Setback: must be metgis a lice e <br /> 4. Massing&Lot Coverage by Structures limited to 15%of lot area does not anoly(lot area>2 acres) <br /> 5. Hardcover limitations:Are N appiicabl-o -Ae appiicabl <br /> Stormwater Quality Overlay District Tien 1)2 3 Tier 1 hardcover limit= 25%of gross lot area <br /> 6. Municipal sewer is available. <br /> 7. No wetlands(s)appear to be present. <br /> The unders ed p p own -ije cknowledges receipt of the above information. Staff Initials <br /> <o//rp em, <br /> erty <br /> Pr Ownat <br /> Owner's Signature Date <br /> (Original:Street File; Copy:Property Owner) <br /> Created: April 2013 <br /> Last Updated: 1/30/2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.