Laserfiche WebLink
i! CITY of ORONO <br /> Municipal Offices <br /> G Street Address: Mailing Address: <br /> 'Irv9�ES?�Ipg 2150 Kelley Parkway P.O. Box 66 <br /> -_- Orono, MN 55356 Crystal Bay, MN 55323.0066 <br /> To: The Current Owner of Address 3 fJ� cj'a <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes <br /> No <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> legal action. <br /> System Identified as Non-Compliant <br /> Yes <br /> No <br /> If yes, system must be brought into compliance by: <br /> December 31,2007 <br /> December 31,2010 <br /> Other <br /> Septic Tanks ump out Needed <br /> Yes <br /> No <br /> The City recommends the septic tank(s) and/or lift tank be serviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> AJO Ce 60"D . The tank(s) should be cleaned through the manhole and <br /> not through the inspection pipes, this allows for proper cleaning. <br /> Comments: <br /> Inspector:.,, )fi, j Date of Inspection <br /> Telephone(9_52)249-4600 o Fax (9_52)249-4616 <br /> www.ci.orono.mn.us <br />