My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-16-1987 Planning Minutes
Orono
>
Planning Commission
>
1987
>
11-16-1987 Planning Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2023 12:10:17 PM
Creation date
9/21/2023 9:36:25 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MIBDTBS OP THE PUaniMG O IISSIOM TIHG HELD HOVBMBBR 16, 1987 <br />§1228 Nin ij»COBTIEI <br />problem. Regarding staff recommendation, he asked to be <br />allowed a deck and stair system 6'x 8* in dimension. <br />There were no comments from the public regarding this <br />matter and the public hearing was closed. <br />It was moved by Bellows, seconded by Hanson, to <br />recommend approval of the variance per staff <br />recommendation conditioned upon removal of the 8'x 30' <br />deck to be replaced with a smaller deck and stair system <br />not to exceed 6'x 8' in dimension. Moiton, Ayes 5, Nays <br />0. <br />#1187 BOETH ASM ESTATES ASSOCIATION <br />215, 340, 350, 360 6 370 NORTH ARM LANE <br />COMDITIOHAL USE PERMIT <br />SECOND REVIEH <br />Rod Backerud was present representing the North Arm <br />Estates Association. <br />Mabusth explained the request involving the creation of <br />berms to receive 25,000 cubic yards of spoils from the <br />suction dredging of the North Arm Channel. The revised <br />grading plans designate 2 berm areas now located out of <br />the 931.5 elevation. Each berm meets the 75' setback <br />from the lake (channel area) but the northern portions <br />of the berm now encroach within 26' of the the wetlands. <br />Berms are constructed with 4" PVC pipe at 2' height <br />intervals. Mabusth noted that the MCWD has not yet <br />given approval of the project. <br />Rod Backerud explained the process involved and length <br />of time involved. <br />Bellows stated she was very leary of <br />project being started at this time of <br />impact of a freeze-thaw cycle. <br />this type of <br />year and the <br />Staff did not have a definite answer to whether a <br />freeze-thaw cycle would adversely affect this project. <br />It was moved by Brown, seconded by Hanson, to recommend <br />approval per staff recommendation subject to applicant <br />working with staff regarding the freeze-thaw concerns; <br />and noting that the plan indicates a slight encroachment <br />in the 26' wetland setback. Motion, Ayes 5, Nays 0. <br />APPROVAL OF MINUTES <br />It was moved by Hanson, seconded by Brown, to approve <br />the Minutes of the October 19, 1987 Planning Commission <br />meeting. Motion, Ayes 5, Nays 0.
The URL can be used to link to this page
Your browser does not support the video tag.