My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-18-2023 Planning Commission Packet
Orono
>
Planning Commission
>
2023
>
09-18-2023 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2023 8:48:37 AM
Creation date
9/19/2023 8:18:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
In situations where improvement is proposed on a lot adjacent to a vacant lot or right-of-way, <br />the average lake shore setback shall be equivalent to the setback of the most lakeward <br />protrusion of the principal building on the immediately adjacent improved lakeshore lot. <br />In situations where the average lake shore setback line bisects the principal building located on <br />either adjacent lot, the next most adjacent lake side point of the bisected principal building shall <br />be used for determining the average lakeshore setback. If the line continues to bisect the <br />principal building, the next most lakeside point is to be used until the setback line does not bisect <br />the principal building on an adjacent lot. <br />(Ord. No. 101 2nd series, § 1(10.56(16)(C)), 2-24-1992; Ord. No. 11 3rd series, § 1, 5-24-2004; Ord. No. 106 3rd <br />series, § 28, 6-10-2013; Ord. No. 157 3rd series, § 1, 8-10-2015; Ord. No. 222 3rd series, § 19, 12-10-2018; Ord. No. <br />234 3rd series, § 1, 10-14-2019; Ord. No. 243 3rd series, § 2, 4-13-2020) <br />(Supp. No. 20) <br />Page 2 of 2 <br />Created: 2023-02-03 16:30:23 [EST] <br />
The URL can be used to link to this page
Your browser does not support the video tag.