My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-21-1988 Planning Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
1980-1989
>
1988
>
03-21-1988 Planning Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2023 4:21:32 PM
Creation date
9/14/2023 4:11:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MIMITBS OP TBB PLIWIIIO OCMMl^IOT tOEBTliG I I .^#1 Httci 31. ini <br />•1251 8CH0LTS COaTIMOBD <br />There were no other comaients froai the public and the <br />public hearing was closed. <br />It was moved by Bellows, seconded by Johnson, to <br />recoBBsend approval of the partial vacation as proposed! <br />per staff recommendation. Motion, Ayes 4, Rays 0. <br />•125« mnOPOLlTAR MASTS COMTSOL COMNlSSKSi <br />comm 51 AMD 19 ISTBSSSCnOM <br />COMDITIOSAL USB PBRNIT AMD VABTABCBS <br />PUBLIC BBARIMG 8s30-ts4€ <br />The Affidavit of Publication and Certificate of Mailing <br />were noted. <br />t <br />* <br />Mabusth explained the request for a conditional use <br />permit and variances for the encroachment of the 75* <br />lakeshore protected area, the upgrading of existing lift <br />stations, and installation of two lift stations within <br />the City of Orono. <br />Kimberly Eckhardt of thr MHCC was present for this <br />matter. She explained that the capacities of the <br />existing interceptor line and the lift stations have <br />been reached. To solve the capacity problem they are <br />putting in a parallel system, vacating the existing <br />system, upgrading some of the lift stations, abandoning <br />two lift stations, and putting in some larger lift <br />stations. <br />Chairman Kelley asked how a lift station and the <br />existing pipe being replaced will be abandoned? <br />Ms. Eckhardt stated that they will remove the above <br />ground structures and the lift station is filled with <br />sand; the pipe will not be removed but will be plugged <br />in some areas. She noted that they may attempt to <br />remove the portion of pipe hanging from the bridge. <br />Kent Carlson, 3498 North Shore Drive, explained the <br />history of the lift station located on the corner of <br />Baldur Park and Birch Lane. He felt the problems are <br />directly related to private downspouts and sump pumps <br />discharging to the sewer, and that the City should make <br />an attempt to resolve this abuse before undergoing this <br />expensive project.
The URL can be used to link to this page
Your browser does not support the video tag.