My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-21-1996 Planning Packet
Orono
>
Planning Commission
>
1996
>
10-21-1996 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2023 11:53:05 AM
Creation date
9/14/2023 11:48:50 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MDsUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON NOVEMBER 21, 1994 <br />(#4 - i#19Sl - Coumeya - Continued) <br />AppUcara, Todd Coun-.cya, said Proposal A fits the land well. <br />Smith asked about the square footage of the proposed house. The main level is about <br />1500 s,f. tvith 1000 s.f on the second story. There would be a full basement. A down- <br />sizing of the proposed house was suggested. <br />The ComjTtissioners present ail agreed that althOTgh a smeet <br />over extending the proposed house into the bluff area, the building should fit within the <br />parameters previously determined by the Council. <br />Nei'^hbors had previously voiced their concern whether this lot was buildahle A member <br />Lggested Coumeya get letters from the neighbors e.xpressmg their views on his amended <br />proposeil to be presented at 2 l3.ter meeting. <br />At the Applicant’s request. Lindquist moved. Peterson seconded, to table Application <br />isl981 to the January meeting. Ayes 3. Nays 0. <br />##1982 DANIELS. PERKINS. 55 LANDMARK DRIVE- „ vi <br />VARIANCE/CONDITIONAL USE PERMIT - PUBLIC IIEARLNG 8:00-8:25 P.M. <br />The Certificate of Mailing and Affidavit of Publication were noted. <br />The Applicant was present. <br />Mabusth reported the Application is for a conditional-use permit required for land <br />alterations over 100 vubic yards of material A variance is required as dredging a <br />oroposed within a ^'roteaed wetland area. The proposal involves the removal of <br />Lbic yards of material (peat) over a ten-year period. Excavations will crate two ponda <br />The smaller pond would be 5000 s f in area and take two years in time. The toger pond <br />would be 25000 s f and be completed in eight years The e.xcavated peat wou d e <br />to 200 cubic yards each year. Loren Bunerfield, who will be the contractor will use the <br />peat in Iiis nursery business. Butterfield can only use approximately 200 cubic yards each <br />year. <br />Butterfield operates a nearby nurseiy and landscaping business. Butterfield vvi a ow <br />access through his propertv' and create the ponds for the Applicant; and in turn, e wou <br />receive the peat material for use in his business.
The URL can be used to link to this page
Your browser does not support the video tag.