My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-21-1996 Planning Packet
Orono
>
Planning Commission
>
1996
>
10-21-1996 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2023 11:53:05 AM
Creation date
9/14/2023 11:48:50 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE ORONO PLANNING COMML>S10N <br />MEETING HELD ON SEPTEMBER 16, I99t <br />(#6 - #2171 Minneuasco - Continued) <br />Mabusth reported that the request was for a renewal of a vonditional use permit to allow' <br />Minnegasco to continue the use of a portable vaporizer at ^30 Old rr>stal Bay Road in <br />the industrial zoning district The vaporizer was installed in 1992 In 1995 a ore-year <br />extension was u^mte<3 by the Council, which expires October, 1990 Mabost-t said <br />rvlinnegasco hau oped that the vaporizer would no longer be needed but deliys in <br />improvements for CoRd 6 lines has hindered the upgrade plans Minnegasco believes the <br />vaporizer will be phased out by spring of 1998 <br />Maousth add“d that the police chief and fire department had little knowledge of the <br />vaporizer Since the review in 1995, they were provided information on the vaporizer, <br />and the police chief w atched the filling process involved He relayed good comments <br />noting the use of adequate number of employees and care The police chief informed Staff <br />that he sees no problem with granting the extension <br />Mr Kahlstrom said the project was in place at their plant, but they did not have total <br />control over matters involving CoRd t> He noted that the supply from the west serving <br />Orono i.« ^ ot adequate to meet the needs of the area The supply is increasing with the <br />installatiovr of the main project next summer. The vaporizer is needed for one more year <br />for use in 1997-1998 <br />Lindquist asked Kahlstrom if he saw any problem w ith the vaporizer being phased out by <br />spring of 1998. Kahlstrom did not <br />McMillan asked what was done with the excess at the end of the season. Kahlstrom said <br />there is no excess as there is no on-site storage The gas is brought in by tanker and then <br />driven away. <br />ochroeder asked how many v aporizers were in use and if there w ere any problems <br />Kahlstrom said this was the only one of its kind in the Midwest and it has presented no <br />problems There is a liquid gas facility in Burnsville used by the tanker and for use as a <br />portable pipe line The natural gas is shipped in <br />Smith noted that the information says the vaporizer is only used three to four times a <br />season McMillan and Mabusth reported that it was used 19 time- last year The colder <br />temperatures were a factor <br />Schroeder moved, Hawn seconded, to approve the renew al of the conditional use permit <br />for an additional year with the vaporizer phased out by May 31, 1998, Vote; Ayes 6, <br />Nays 0
The URL can be used to link to this page
Your browser does not support the video tag.