Laserfiche WebLink
F. <br />HARDCOVER CALCULATION WORKSHEET <br />SETBACK ZONE: (CIRCLE ONE) 0.75’75.250’250.500’500.1000* <br />J <br />A.House <br />Length <br />*fO <br />__La____ <br />•/ <br />B.Garage <br />\ c.Dris’eway 21A»30 —___ <br />D.Sidewalk __ilfi_____ <br />#, <br />E.Patio/Deck <br />'a —Ag—— <br />1 Landscape <br />f ^in <br />X <br />X <br />X <br />Width <br />X <br />X <br />Xo <br />i3i <br />», * <br />X <br />X <br />X <br />X <br />By Plastic <br />G. Other <br />X <br />X <br />X <br />1% <br />•o <br />TOTAL HARDCOVER IN ZONE <br />TOTAL PROPERTY AREA IN ZONE <br />L B 6fci2>5 <br />PROPOSED HARDCOVER IN ZONE <br />A. House ____________X <br />Length Width <br />X <br />X <br />X <br />B. Garage <br />C. Driveway <br />Un <br />X <br />X <br />D. Sidewalk X <br />X <br />E. Patio/Deck X <br />X <br />F. Landscape <br />Underlain <br />By Plastic <br />X <br />X <br />X <br />G. Other <br />TOTAL HARDCOVER IN ZONE <br />TOTAL PROPERTY AREA IN ZONE <br />B <br />PROPl <br />X 100 <br />X 100 = <br />»S.F. <br />m U46 S.F. <br />as S.F. <br />*S.F. <br />S.F. <br />as 5^p S.F. <br />ss S.F. <br />n 190 S.F. <br />«r S.F. <br />as too S.F. <br />*S.F. <br />S.F. <br />s S.F. <br />ss S.F. <br />WZB <br />-•TlX _ i.f. <br />3>l*ffc F. <br />-__ativs 5.F. <br />ss <7*% <br />S.F. <br />ss S.F. <br />as S.F. <br />ss S.F. <br />ss S.F. <br />S3 S.F. <br />SS S.F. <br />S.F. <br />ss S.F. <br />S.F. <br />ss S.F. <br />S3 S.F. <br />S3 S.F. <br />ss S.F. <br />as S.F. <br />fZi S.F. <br />-S.F. <br />S3 __0.__% <br />y <br />A <br />A <br />B <br />■4