My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-16-1996 Planning Packet
Orono
>
Planning Commission
>
1996
>
09-16-1996 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2023 11:51:54 AM
Creation date
9/14/2023 11:48:07 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ORONO PLANNING COMMISSION MEETING <br />MINUTES FOR AUGUST 19,1996 <br />ROLL <br />The Orono Planning Commission met on the above date \vith the following members <br />present Chair Dale Lindquist, Ste\ e Peterson, Sandra Smith, Janice Berg, Elizabeth <br />Hawn, and William Stoddard Charles Schroeder was absent The following represented <br />the City Staff Assistant Zoning and Planning Administrator Michael Gaffron, and <br />Recorder Sherry Frost. Council members Jabbour and Goetten, along with Mayor <br />Callahan, were present Chair Lindquist called the meeting to order at 7:00 p m <br />SCHEDUl ED PUBLIC HEARINGS/PUBLIC INFORMATION REVIEWS <br />(HI) #2158 JOHN O SULLIVAN/GRACE BAPTIST CHURCH PROPERTY, 2380 <br />SHADYWOOD ROAD - REZONLNG - PUBLIC HEARING 7:00-7:45 P.M. <br />The Affidavit of Publication and Certificate of Mailing w ere noted <br />John O’SuUivan, Erwin Smith, and Dan Clausen of the North Conservative Baptist <br />Conference were present <br />Gaffron reported that the applicant has an option to purchase the 1.7 acre parcel own^ by <br />the church. The parcel is being considered fbr rezoning from LR-IC to B-5 commercial <br />consisting of limited neighborhood businesses. The conceptual plan is for light retail and <br />office in a 2-story building, to include a bank with drive-thru, with stormwater retention <br />pond on the property and vacation of a portion of Navarre Lane. At this time, the <br />Planning Commission is to consider the rezoning issue and not the use itself Gaffron <br />asked the Commission to consider five general issues for discussion; 1) Does the <br />proposed rezoning fit with Orono's Comprehensive Plan for the Navarre business district? <br />2) If not, should the City consider a rezoning request absent a comprehensive zoning <br />"needs" review of the Navarre area? 3) Is B-5 the appropriate district for the proposed <br />uses? 4) Are the proposed uses appropriate for this location, adjacent to an existing single <br />family neighborhood'’ and 5) If the property is rezoned, and if the parcel is ultimately sold <br />to anotner developer, are all of the aillowed uses in the B-5 zone appropriate for this <br />location? <br />Gaffron cited some of the background and history of rezoning in the Navarre area. The <br />last rezoning occurred in 1983 Gaffron said it was Staffs opinion that a comprehensive <br />review of the Navarre area should be conducted before rezoning a specific site, but a <br />specific application is before the Commission for review and is asking for consideration. <br />1
The URL can be used to link to this page
Your browser does not support the video tag.